My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_JULY 2014 FINAL RCSI
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
Archieved Reports
>
ARCHIVED REPORTS_JULY 2014 FINAL RCSI
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 11:36:58 AM
Creation date
12/16/2021 11:39:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
JULY 2014 FINAL RCSI
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM NO. R5-2014-0006 <br />FORWARD INC. AND REPUBLIC SERVICES INC. <br />FORWARD CLASS II LANDFILL <br />SAN JOAQUIN COUNTY <br />8 <br />inspection. Notification and reporting requirements for major storm <br />events shall be conducted as required in Section B.5 of this MRP. <br /> <br />c. Five-Year Iso-Settlement Survey for Closed Units <br /> <br />For closed landfill units, the Discharger shall conduct a five-year <br />iso-settlement survey and produce an iso-settlement map accurately <br />depicting the estimated total change in elevation of each portion of the <br />final cover’s low-hydraulic-conductivity layer. For each portion of the <br />landfill, this map shall show the total lowering of the surface elevation of <br />the final cover, relative to the baseline topographic map [Title 27, section <br />21090(e)(1 & 2)]. Reporting shall be in accordance with Section B.6 of <br />this MRP. The next iso-settlement survey shall be conducted in 2017. <br /> <br />d. Standard Observations <br /> <br />The Discharger shall conduct Standard Observations at the landfill in <br />accordance with this section of the MRP. Standard observations shall <br />be conducted in accordance with the following schedule: <br />Landfill Unit Type Frequency Season <br />Active Weekly Wet: 1 October to 30 April <br />Active Monthly Dry: 1 May to 30 September <br />Inactive/Closed Monthly W et: 1 October to 30 April <br />Inactive/Closed Quarterly Dry: 1 May to 30 September <br /> <br />The Standard Observations shall include: <br />1) For the landfill units: <br />a) Evidence of ponded water at any point on the landfill outside of <br />any contact storm water/leachate diversions structures on the <br />active face (show affected area on map); and <br />b) Evidence of erosion and/or of day-lighted refuse. <br />2) Along the perimeter of the landfill units: <br />a) Evidence of leachate seeps, estimated size of affected area, and <br />flow rate (show affected area on map); and <br />b) Evidence of erosion and/or of day-lighted refuse.
The URL can be used to link to this page
Your browser does not support the video tag.