Laserfiche WebLink
2-5 <br />Currently, there are no daily (unusual) peak loadings. The RRF and landfill (combined) are able <br />to receive a 620-trip maximum threshold allowed for the entire Forward facility as discussed in <br />Section 3.2.9. Loading up to the maximum traffic inflow can be accommodated by the use of <br />back-up equipment and additional trips to the Forward Landfill can be accomplished to handle <br />residual waste. If the capacity is ever reached, additional personnel will be added, as needed . <br />When the RRF is at capacity, all excess loads are turned away. <br />2.6 Equipment (14 CCR. Sections 17416.3 and 18221.6 (I)) <br />A variety of equipment is used in the operation of the station. The equipment on-site is <br />adequate to meet operational and maintenance needs in order to comply with 14 CCR, <br />Section 17416.3. The equipment available at the RRF is listed in Table 1. The equipment <br />varies dependent upon the type of operations being performed at the RRF; therefore, Table 1 <br />indicates the use of the equipment. Not all the equipment listed on Table 1 may be present on <br />the site, equipment will be brought on site as operations warrant their need. Standby <br />equipment is discussed in Section 2.6.2. <br />2.6.1 Equipment Maintenance <br />Besides daily maintenance (i.e., checking belts and fans, engines, hydraulic oil, fuel, blowing <br />down dust, etc.), the RRF has implemented a preventive maintenance program to ensure the <br />reliability of all equipment and vehicles. The maintenance program that routinely schedules all <br />heavy equipment for servicing based on the number of hours the equipment has been in <br />service (250 hours, 500 hours, 750 hours, 1000 hours, etc.). In-house personnel perform all <br />maintenance and repairs. An outside vendor who specializes in the related area of equipment <br />may be used for maintenance and/or repair, as needed. Equipment maintenance and <br />operation must occur during the permitted hours of operation (see Section 2.2). Daily <br />inspections are conducted related to vehicle and equipment operation. A copy of the <br />maintenance form/checklist is included in Appendix C. <br />2.6.2 Standby Equipment <br />RRF personnel continually evaluates the need for additional equipment for transfer operations. <br />Any standby, specialized, or additional equipment can be leased or rented from local <br />contractors or suppliers. The RRF has established contract agreements with the followin g <br />local contractors and suppliers to provide equipment, as needed. <br />Forward Resource Recovery Facility SWT Engineering <br />Transfer/Processing Report -May~ 2014 <br />z:\projects \alli ed waste \forward\resource recovery facility\5 yr permit rvw 2013-14\tpr 2014\text\se c2.doc