My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_JULY 2014 FINAL TPR
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
Archieved Reports
>
ARCHIVED REPORTS_JULY 2014 FINAL TPR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 11:26:22 AM
Creation date
12/16/2021 12:35:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
JULY 2014 FINAL TPR
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consolidated Forward Landfill Project -Mitigation Monitoring and Reporting Program Checklist <br />Mitigation Measure <br />design <br />Separation between <br />liner and groundwater <br />Leak detection system <br />Operations layer <br />over liner <br />Double liner under <br />sump area <br />Electric testing of <br />each WMU liner <br />RWQCB required <br />changes <br />47 (PA) Engineering leachalc <br />controls <br />Leachate monitoring <br />Leachate reporting! <br />Instilutional conlrols <br />RWQCIl and DTSC <br />required changes <br />'--', \ <br />Implementation <br />included with the Improvement Plan <br />Responsibility: Landfill operator <br />Timing: . Letter from RWQCB shall be <br />included with the Improvement Plan <br />Responsibility: Landfill operator <br />Timing: Letter from RWQCB shan be <br />included wilh the Impro'(ement Plan <br />Responsibility: Landfill operator <br />Timing: Letter from RWQCB shall be <br />included with the Improvement Plan <br />Responsibility: Landfill operator <br />Timing: Letter from RWQCB shall be <br />included with the Improvement Plan <br />Responsibility: Landfill operator <br />Timing: Prior to submission of <br />Construction Quality Control Assurance <br />Report for each cell <br />Responsibility: Landfill operator <br />Timing: As required by RWQCB <br />Responsibility: Landfill operator <br />Timing: Leiter from RWQCB shall be <br />included with the Improvement Plan <br />Responsibility: Landfill operator <br />Timing: Daily <br />Responsibility: Landfill operator <br />Timing: Quarterly <br />Responsibllily: Landfill operator <br />Timing: As required <br />Monitoring <br />Waste Discharge Requirements (WDRs) <br />Responsibility: RWQCB <br />Timing: Prior to approval of <br />Waste Discharge Requirements (WDRs) <br />Responsibility: RWQCB <br />Timing: Prior to approval of <br />Waste Discharge Requirements (WDRs) <br />Responsibility: RWQCB <br />Timing: Prior to approval of <br />Waste Discharge Requirements (WDRs) <br />Responsibility: R WQCB <br />Timing: Prior to approval of <br />Waste Discharge Requirements (WDRs) <br />Responsibility: RWQCB <br />Timing: Prior to approval of <br />Construction Quality Control Assurance <br />Report for each cell <br />Responsibility: RWQCB <br />Timing: As required by RWQCB <br />Responsibility: RWQCI3 <br />Timing: Prior to approval of <br />Waste Discharge Requirements (WDRs) <br />Responsibility: R WQCll, DTSC <br />Timing: Quarterly <br />Responsibility: RWQCIl, DTSC <br />Timing: Q\lnrt~rly <br />Responsibility: RWQCll ulltVor DTSC <br />Timing: As required <br />/""". <br />Implementation <br />Confirmation Comments <br />Page 36
The URL can be used to link to this page
Your browser does not support the video tag.