Laserfiche WebLink
Consolidated Forward landfill Project -Mitigation 1-,ring and Reporting Program Checklist <br />Mitigation Measure <br />48 (F.S) Design for pre-loaded <br />settlement <br />Future design of <br />vertical expansion <br />Maintain extraction <br />wells <br />CIWMB and RWQCB <br />review vertical <br />expansion design <br />49 (F.6) Sample off-site wells <br />to east <br />Sample additional <br />off-site wells <br />Extract/treat VOCs <br />in offsite plume <br />50 (F.7) Infiltration of treated <br />groundwater <br />51 (1'.9) Replncc grouudwater <br />monitoring wells <br />Implementation .. <br />Responsibility: Landfill operator <br />Timing: Letter from RWQCB shall be <br />included with the Improvement Plan <br />Responsibility: Landfill operator <br />Timing: Prior to submission of Landfill <br />Design Plans for vertical expansion <br />Responsibility: Landfill operator <br />Timing: Ongoing <br />Responsibility: Landfill operator <br />Timing: Prior to submission of Landfill <br />Design Plans for vertical expansion <br />Responsibility: Landfill operator <br />Timing: Quarterly (same frequency <br />as onsite wells) <br />Responsibility: Landfill operator <br />Timing: At least twice a year <br />Responsibility: Landfill operator <br />Timing: Ongoing <br />Responsibility: Landfill operator <br />Timing: Ongoing <br />Respousibility: landfill oporator <br />Timing: As required by RWQCD <br />52 Austin 1994 (K3.c). Austin 2000 (K3.c) <br />Timing of discharge of Responsibility: Landfill operator <br />detention pond Timing: Ongoing <br />53 Austin 1994 (K5.e), Austin 2000 (K5.e) <br />Salvage metallic discards Responsibility: Landfi~l.operator <br />Monitoring <br />Responsibility: RWQCB and CJWMB <br />Timing: Prior to approval of <br />Waste Discharge Requirements (WDRs) <br />Responsibility: RWQCB and CIWMB <br />Timing: Prior to approval of Landfill <br />Design Plans for vertical expansion <br />Responsibility: RWQCD <br />Timing: Annually <br />Responsibility: RWQCB and CJWMB <br />Timing: Prior to approval of Landfill <br />Design Plans for vertical expansion <br />Responsibility: RWQCD <br />Timing: Quarterly (same frequency <br />as onsite wells) <br />Responsibility: RWQCB <br />Timing: At least twice a year <br />Responsibility: RWQCB <br />Timing: Quarterly <br />Responsibility: RWQCB <br />Timing: Quarterly <br />Responsibility: R WQCll <br />Timing: As dctcrmincd by RWQClI <br />Responsibility: RWQCB <br />Timing: Annually <br />Responsibility: San Joaquin County <br />Implementation <br />Confirmation Comments <br />,37