My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2018-2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2018-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 4:27:38 PM
Creation date
12/20/2021 12:36:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2018-2019
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />Consecutive inspections needed for the project will be scheduled with <br />EHD inspector on site after the first inspection. <br />Inspections will be coordinated with EHD for the following work: <br />1. Well Installation <br />2. Backfill of abandoned borings <br />SWD understands that drilling the well boreholes does not require <br />inspection by EHD. SWD will schedule inspections with EHD, between <br />9:00 a.m. and 4:00 p.m during working days. SWD will pay overtime for <br />inspections that require overtime hours by EHD staff. <br />, I 1 11 ,. 1 <br />4.1 RESPONSIBILITY FOR SAFETY <br />Gregg Drilling is required to ensure work area meets all safety <br />requirements. Gregg Drilling will be responsible for the safety of its <br />workers during this project. Gregg Drilling will provide a job Foreman for <br />the project that has completed the 40 -hour OSHA safety -training course. <br />Gregg Drilling will provide OSHA training certification of the job Foreman <br />working at the site upon request. <br />4.2 SITE CONDITIONS <br />The installation of the new GW monitoring wells does not include <br />excavation of refuse or contact with refuse. <br />Potential risk with landfill gas may be an issue but minimal as the new GW <br />wells are further away from refuse footprint. FHSL's perimeter LFG <br />migration monitoring wells have shown methane readings of less than one <br />percent by volume. The lower explosive limit of methane is five percent by <br />volume. Potential hazards of methane gas are: fire, explosion and <br />asphyxiation. <br />A. SWD's contractor will conduct a safety meeting with County staff and <br />Contractor's employees before the start of the project. During the first <br />safety meeting, SWD's Contractor will inform employees not to touch <br />refuse if encountered. Employees will be asked to wear gloves when <br />working. <br />Work Plan- FH -Groundwater Monitoring Well Installation San Joaquin County <br />8/14/2018 Department Of Public Works <br />3 Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.