Laserfiche WebLink
I <br />I <br />I <br />I <br />�nl <br />I <br />I <br />FINISH A. <br />I <br />-� ftENSE <br />J-ftENSE— <br />'n <br />I <br />1OP01tARY S0N 40 PK SLIP GP <br />LWP�IBW— <br />ACTEOx50�L_ DLL <br />T - —SE-.- <br />IAWIEC WBB-100 YE11 9(RT 6'%6' <br />IHILO(NESS VARES(TYP) <br />DPE OVERDNFR. <br />eEN,DNTE (,ro> <br />601E BALKiLL-YAx tY LE15 <br />gtxE68 vAeM1S(1W) <br />eFNiONIE (lYP) ,�.NEiUSE.-• <br />90.10AWE11 G91eG 11 <br />SOIL BALNHLL <br />6NAP5 1RAH8xET (1N) <br />HDPE GE00011P—lE <br />HED (ttP <br />�01E DEPTH (SCE — SLT1En1AE) <br />TION lK: WASTE (SEE 8.fl1 SCHDNIIE) <br />TYPICAL LFG EXTRACTION WELL <br />NOT TO SCALE <br />— G6TBNE sam PERF. <br />LEGEND <br />- - — <br />SOIL GAS MONITORING PERIMETER <br />• <br />MODULE LIMIT <br />----8---- <br />ABOVE GROUND LFG PIPING (SIZE IN INCHES) <br />---4--- <br />BURIED LFG PIPING (SIZE IN INCHES) <br />- --- - - - - <br />E%1$TING OVERHEAD ELECTRICAL <br />------uE------ <br />EXISTING BURIED ELECTRICAL <br />�3Y <br />EXISTING FORCEMAIN <br />DESIGNED BY: <br />SOILI.ANI 11--GASVAPORPROBE <br />TTT�•1^ <br />LANDFILL GAS E%TRACTION WELL <br />DRAWN BY: <br />MONITORING WELL <br />FIG 3 <br />STORM WATER MONITORING POINT <br />Q� <br />EXISTING BLIND FLANGE <br />EXISTING ISOLATION VALVE <br />z-te <br />PROPOSED IAN -1-1- GAS EXTRACTION WELL <br />FINISH A. <br />I <br />-� ftENSE <br />J-ftENSE— <br />'n <br />I <br />1OP01tARY S0N 40 PK SLIP GP <br />LWP�IBW— <br />ACTEOx50�L_ DLL <br />T - —SE-.- <br />IAWIEC WBB-100 YE11 9(RT 6'%6' <br />IHILO(NESS VARES(TYP) <br />DPE OVERDNFR. <br />eEN,DNTE (,ro> <br />601E BALKiLL-YAx tY LE15 <br />gtxE68 vAeM1S(1W) <br />eFNiONIE (lYP) ,�.NEiUSE.-• <br />90.10AWE11 G91eG 11 <br />SOIL BALNHLL <br />6NAP5 1RAH8xET (1N) <br />HDPE GE00011P—lE <br />HED (ttP <br />�01E DEPTH (SCE — SLT1En1AE) <br />TION lK: WASTE (SEE 8.fl1 SCHDNIIE) <br />TYPICAL LFG EXTRACTION WELL <br />NOT TO SCALE <br />— G6TBNE sam PERF. <br />—1PG%-18 <br />2200.880 8.4]8,500 300420G TBD TBD iBD TIED <br />TBD <br />PG% -e8 2200.285 6.1]8,]]5 300 430 IBD TBD 10D TBD <br />TBD <br />PGF -2D 2199.1]0 S.""" 250 ]90 TBD 180 iW IBD <br />iBD <br />;!➢0.]50 6.4X.880 250 300 TBD TBD <br />PROJECT NO.: 6 31 2 3 019 5 DATE. <br />DRAFT ,I>1 APTIM Environmental & <br />Infrastructure, Inc. <br />FOOTHILL SANITARY LANDFILL <br />PROJECT NO.: 6 31 2 3 019 5 DATE. <br />AUGUST tole <br />SAN JOAQUIN COUNTY <br />LINDEN, CALIFORNIA <br />DESIGNED BY: <br />ECK <br />DRAWING NUMBER: <br />DRAWN BY: <br />ECK <br />FIG 3 <br />EXISTING AND PROPOSED LANDFILL <br />CHECKED BY: <br />DHT <br />GAS COLLECTION AND CONTROL SYSTEM <br />APPROVED BY: <br />DHT <br />SHEET 1 of 1 <br />