My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2018-2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2018-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 4:27:38 PM
Creation date
12/20/2021 12:36:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2018-2019
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ri= • . • Department of Public Works <br />SANAAQUIN <br />Kris Bala i, Director of Public Works <br />—COUNTY— <br />Greatness <br />Fritz Buchman, Deputy Director/Development <br />Greatness grows here. YOU Michael Selling, Deputy Director/Engineering <br />W <br />�6 Jim Stone, Deputy DirectorlOperations <br />Kristi Rhea, Manager of Strategic Initiatives <br />August 30, 2018 <br />Mr. Howard Hold, P.G. <br />Senior Engineering Geologist <br />Central Valley Regional Water Quality Control Board <br />11020 Sun Center Drive #200 <br />Rancho Cordova, California 95670-6114 <br />SUBJECT: RESPONSE TO RWQCB REVIEW LETTER DATED AUGUST 8, 2018, <br />FOOTHILL SANITARY LANDFILL (FSL) <br />Dear Mr. Hold: <br />Please find attached the Revised Work Plan in response to the Regional Water Quality Control <br />Board's (RWQCB) review letter dated August 8, 2018 of the initial work plan. <br />The Revised Work Plan covers the following: <br />• Installation of background groundwater monitoring well MW -4A <br />• Installation of new point of compliance groundwater monitoring well MW -7 south east of <br />LF -1 (Module "I") <br />• Conceptual design of additional Landfill Gas (LFG) extraction wells on Module "I" and 1 <br />• Tentative project schedule for construction of new flare station and additional LFG <br />extractions wells <br />If you have any questions, please contact Joyesh Chandra, Engineer II, at (209) 468-3066. <br />Sincerely, <br />TAJ M. BAHADORI, PE <br />Senior Engineer <br />TMB:mf <br />N:\1 Foothill\RWQCB\Correspondence\Drafts\2018-8-30 FH NOV Revised Work Plan.docx <br />Enclosure <br />Jim Stone, Deputy Director/Operations (electronic copy) <br />Desi Reno, Integrated Waste Manager (electronic copy) <br />Robert McClellon, Environmental Health Department (electronic copy) <br />1810 East Hazelton Avenue I Stockton, California 95205 1 T 209 468 3000 1 F 209 468 2999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.