Laserfiche WebLink
• <br />2018 WINTERIZATION FOLLOW UP INSPECTION REPORT <br />FOOTHILL LANDFILL <br />INSPECTION <br />Inspection was performed on December 13, 2018 per RWQCB request. In general, the <br />site is still in excellent readiness for the upcoming winter. <br />Most side slopes showed healthy vegetative cover that will be protective against erosion <br />with the exception of the active face and portions of module 1, which are being sliver - <br />filled to recover air space. <br />MODULE "I" <br />Module "I" - NE Slope I Module "I" - SE Slope <br />FH -2018 -Winterization Inspection <br />