Laserfiche WebLink
0 0 <br />Work and Safety Plan for Pile Load Testing Services <br />Foothill Landfill Solar Array <br />2/14/2019 <br />Terracon will hire a backhoe service to extract the piles after testing. Unless otherwise <br />requested by Ameresco, piles will be collected and placed in one location and left onsite for <br />disposal during construction. <br />SAFETYB. <br />Terracon is currently not aware of environmental concerns at this project site that would create <br />health or safety hazards associated with our exploration program; thus, our scope considers <br />standard OSHA Level D Personal Protection Equipment (PPE) appropriate. <br />Exploration efforts require driving steel beams into the subsurface, therefore Terracon complies <br />with local regulations to request a utility location service through 811 Dig Alert. <br />A daily safety briefing will be performed by the Terracon Site Representative (Chris Congrave) to <br />discuss the days activities prior to the start of work. A pre -task plan will be available on-site which <br />will include the locations to nearest hospital and emergency contact numbers. <br />