Laserfiche WebLink
Taj M. Bahadori, P.E. <br />Senior Civil Engineer <br />San Joaquin County Department of Public Works <br />Solid Waste Division <br />1810 E. Hazelton Avenue <br />Stockton, CA 95201 <br />• <br />APTIM <br />180 Promenade Circle, Suite 320 <br />Sacramento, CA 95834 <br />Telephone: 925-457-1130 <br />July 6, 2018 <br />Project 631230195 <br />Re: Response to June 6, 2018 Notice of Violation of the Second Semester and <br />Annual 2017 Groundwater Monitoring Report for the Foothill Sanitary Landfill in <br />San Joaquin County <br />Dear Mr. Bahadori: <br />This letter is in response to the Regional Water Quality Control Board's (RWQCB) Notice <br />of Violation (NOV) of the Second Semester and Annual 2017 Groundwater Monitoring <br />Report for the Foothill Sanitary Landfill (FSL) dated June 6, 2018. The NOV requested <br />San Joaquin County (County) to submit a Work Plan by July 16, 2018. <br />The Work Plan is requested to respond to the following three issues: <br />Install one groundwater monitoring well at the point of compliance of Module I, <br />near gas probe SG -6. The basis for this well is to provide additional control across <br />the site for groundwater flow direction and gradient and to provide additional <br />capability to detect a release at the earliest possible time from the Unit. <br />Either re -install or re -construct background well MW -4. <br />Provide reasoning in the work plan, why the last four single completion gas probes <br />(SG -4, -5, -7, & -9) have not been reconstructed as triple completion gas probes. <br />Work Plan and Comments Thereto <br />Install Monitoring Well near SG -6 <br />The RWQCB stated in the NOV that the Detection Monitoring Program (DMP) for the <br />FSL is deficient and that there are not a sufficient number of wells at the eastern Point of <br />Compliance of Module I to allow for the detection of a release from the unit, or a sufficient <br />number of wells that provide the best assurance of the earliest possible detection of a <br />2018-07-16 FH Workplan <br />