Laserfiche WebLink
COMMENTS ON DEVELOPMENTS <br /> MS-92-213 <br /> 4 . The frontage improvements for Canal Boulevard shall be <br /> constructed in conformance with the standards for one-half of <br /> a 60-foot right-of-way rural collector road. The construction <br /> of the frontage improvements will be deferred, upon execution <br /> by the owner of a Deferred Frontage and Roadway Improvement <br /> Agreement or a Secured Deferred Frontage and Roadway <br /> Improvement Agreement with a deposit equivalent to their <br /> estimated construction costs prior to approval of the Parcel <br /> Map. (A $250. 00 fee currently is required for processing per <br /> Development Title Table 9-240.2 in addition to a copy of the <br /> Grant Deed, legal description of Parcel 1 and an estimate. The <br /> estimate and legal descriptions shall be prepared by a <br /> Registered Civil Engineer with a typical section drawing on a <br /> form to be supplied by the Public Works Department and <br /> submitted to the Public Works Department for approval. As an <br /> option the Department of Public Works will prepare the drawing <br /> with estimate for an additional fee of $100.00. ) <br /> (Development Title Section 9-1100. 3) <br /> 5. Any driveway that exceeds 150 feet in length from any public <br /> roadway shall be improved in accordance with the requirements <br /> of the Uniform Fire Code Section 10.207 , San Joaquin County <br /> Standards F-la, F-lb, & F-lc and the Tracy Rural Fire District <br /> prior to issuance of the building permit. <br /> (Development Title Section 9-1145.5) <br /> 6. Requirements for construction of improvements shall be <br /> noticed by a statement on the Parcel Map. <br /> (Subdivision Map Act Section 66411. 1) <br /> c: Manuel Lopez <br /> Deputy Director/Development <br /> 2 <br />