Laserfiche WebLink
IL <br />26. JTD, p.9, section 2.2.1: This section does not include the pre -disposal topography of the <br />site, the acreage of the disposal area (compared to total permitted acreage), fill <br />sequencing order (will the modules be filled in numerical order?), excavation plans, or <br />the vertical limits of the site (max depth and height) as required by T27CCR <br />21600(b)(1)(B). <br />27. JTD, p.9, section 2.2.2: This section does not include land use zoning for all properties <br />within 1000 feet of the facility boundary as required by T27CCR 21600(b)(3)(E). <br />28. JTD, p.9, section 2.2.3: This section does not include the location of hazardous waste or <br />hazardous materials storage areas (including storage for hazardous waste which is <br />inadvertently accepted at the landfill) as required by T27CCR 21600(b)(3)(F). <br />29. JTD, p.9, section 2.3: This section does not include land use permits UP#3295 and <br />UP#3451 (dated 6/3/65). Required by T27CCR 21600(b)(9) <br />30. JTD, p.10, section 2.4: This section does not include the following CEQA documents: <br />the Notice of Determination (dated 4/28/95) and the Negative Declaration (95-OIND- <br />75100) (dated 3/29/95). Pursuant to T27CCR 21570(f)(3) <br />31. JTD, p.1 1, section 3.1: This section does not include information on the handling of <br />electronic waste, especially televisions and computer monitors. Pursuant to T27CCR <br />21600 (b)(2)(A). <br />32. JTD, p.16, section 4.2: This section does not include volumetric capacity calculations as <br />required by T27CCR 21600(b)(3)(B). <br />33. JTD, p.16, section 4.2: The volumetric capacity information is not specifically certified <br />by a registered civil engineer or registered geologist as required by T27CCR <br />21600(b)(3)(B). <br />34. JTD, p.18, section 4.4: Typo "evapotranspiratieve." <br />35. JTD, p.30, section 6.1: This section does not show how the site design accommodates <br />the service area, use by the general public, climatological factors, physical setting, soils, <br />and drainage. This section does not show that the site design was developed by a <br />registered civil engineer or geologist as required by T27CCR 21600(b)(4)(A). <br />36. JTD, p.32, section 6.3: This section does not reference a map which shows the site <br />contours before module "P' and 1 were filled, as required by T27CCR 21600(b)(4)(C). <br />37. JTD, p.34, section 6.6: This section does not include a description of the gas monitoring <br />system, the frequency of monitoring, describe how the extracted gas will be handled or <br />reference a map which shows the gas monitoring well locations. This section does not <br />describe how the facility will comply with T27CCR 20919, Gas Control and T27CCR <br />20919.5, Explosive Gases Control. Pursuant to T27CCR 21600(b)(4)(E). <br />38. JTD, p.35, section 6.8: This section does not include the excavation depth limit as <br />required by T27CCR 21600(b)(4)(D). <br />39. JTD, p.37, section 7.1.2: Incorrect code section 20935: "Gas monitoring results from <br />monitoring and any remediation plans required by Title 27, Section 20935." <br />40. JTD, p.37, section 7.1.2: Part 7 of this section is incomplete. Some code sections are not <br />included. For example, "Cost estimates and financial assurance documentation per <br />Section Title 27 Section 22221." Sections 22226, 21820, and 21840 should also be <br />referenced. Pursuant to 27CCR20515(a)(1-6). <br />41. JTD, p.37, section 7.1.2: This section does not include a statement that the <br />owner/operator will notify the San Joaquin County Environmental Health Department <br />Page 3 of 5 <br />