Laserfiche WebLink
when documents listed in T27CCR 20515(a)(1-6) are placed in or added to the operating <br />record. Pursuant to T27CCR 20515(b). <br />42. JTD, p.41, section 7.1.10.1: This section does not include the numbers and qualifications <br />of personnel required for site operations, maintenance, environmental controls, records, <br />emergency and health and safety. The JTD only lists the number of personnel needed for <br />site operations. Pursuant to T27CCR 21600(b)(5)(G). <br />43. JTD, p.47, section 7.4.2: Clarify this section. The sentence, "The following items are <br />stored on-site and removed periodically (Plate 2.1)", is not followed by the identity of the <br />items. <br />44. JTD, p.47, section 7.4.2: The "Inerts - Demolition Stored" salvaged material in Table 5 <br />is not addressed in this section. Pursuant to T27CCR 21600(b)(7)(B). <br />45. JTD, p.57, section 8.3: This section does not include information regarding the <br />corrective action funding and the current corrective action cost estimate. Pursuant to <br />T27CCR 22221. <br />46. JTD, Appendix I, p.3, section 2.2: T27CCR 21790(b)(7) requires "... an estimate of <br />closure date based on volumetric calculations, including supporting documentation." <br />This section does not include volumetric calculations which show how the cubic yards of <br />airspace and waste capacity are determined. The section does not address the effects of <br />landfill settlement on the volumetric calculations. <br />47. JTD, Appendix I, p.4, section 2.3.1: This section does not describe the disposal of <br />leachate control system materials, gas control system materials or structures. Pursuant to <br />T27CCR 21790(b)(8)(A) and T27CCR 21137(b). <br />48. JTD, Appendix I, p.4, section 2.3.2: This section does not address the site security <br />requirements in T27CCR 21790(b)(8)(A) and T27CCR 21135(a -g). <br />49. JTD, Appendix I, p.4, section 2.3.3: This section does not include the volume of soil <br />needed for the final cover, the types of onsite soils to be used as final cover or the test <br />results confirming the suitability of onsite materials to be used for the low permeability <br />layer. Pursuant to T27CCR 21790(b)(8)(B). <br />50. JTD, Appendix I, p.4, section 2.3.3: This section does not include a description of the <br />fifteen foot wide benches required for every fifty feet of vertical height. Pursuant to <br />T27CCR 21790(b)(8)(B), T27CCR 21140(b) and T27CCR 21090(a). <br />51. JTD, Appendix I, p.5, section 2.3.3: The "Construction Quality Assurance" section does <br />not address the requirements in T27CCR 21790(b)(8)(C), T27CCR 20323 and T27CCR <br />20324. <br />52. JTD, Appendix I, p.7, section 2.3.7: This section does not describe how often the <br />leachate volume will be measured or describe the reporting requirements. Pursuant to <br />T27CCR 20340(h). <br />53. JTD, Appendix I, p.8, section 3.2: This section does not address the number of years of <br />postclosure monitoring and maintenance required by T27CCR 21180(a). <br />54. JTD, Appendix I, p.8, section 3.2: This section does not address postclosure monitoring <br />and maintenance of the site security systems as required by T27CCR 21180(x)(1). <br />55. JTD, Appendix I, Appendix A, Site Development Plan: Appendix A does not show the <br />fifteen foot wide benches required for every fifty feet of vertical height. Pursuant to <br />T27CCR 21790(b)(8)(B), T27CCR 21140(b) and T27CCR 21090(a). <br />56. JTD, Appendix I, Appendix C, Landfill Gas Collection and Monitoring System: <br />Section four, "Landfill Gas Migration and Monitoring Probes," requires more detail. <br />Page 4 of 5 <br />