Laserfiche WebLink
This section does not describe the depth of the probes, the monitoring frequency, type of <br />gas sampled, well construction, structure monitoring, corrective action, or EA reporting. <br />Pursuant to T27CCR 20925-20937. <br />57. JTD, Appendix M: The volumetric capacity calculations do not include the amount of <br />capacity consumed by liner construction, intermediate cover and final cover, as required <br />by T27CCR 21600(b)(3)(B). <br />At this time the EHD cannot approve the review application and the JTD. To completely meet <br />the requirements of the EHD and the regulatory sections referenced above revise the review <br />application and the JTD. <br />Submit a revised JTD and review application to EHD within thirty (30) days. <br />Direct questions to Garrett Backus, RENS at (209) 468-2986 <br />arrrett Backus, REHS <br />San Joaquin County Environmental Health Department aDl <br />cc: Keith Kennedy, CIWMB, MS -15 <br />Page 5 of 5 <br />