My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2005-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2005-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:07:54 AM
Creation date
12/30/2021 9:47:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2005-2006
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S. Molly White -3. <br />CHANGE IN BARRIER METHOD AND ADDITIONAL DOCUMENTATION FOR <br />FOOTHILL LANDFILL SITE IMPROVEMENT PROJECT, CAO R5-2004-0706 <br />letter in October 2Q05, reversing those earlier decisions. We will do our best to complete <br />the project by the end of the 2006 construction season, but we must respectfully request a <br />revision to the schedule set forth in the CAO to accommodate this design change. These <br />requested adjustments also address concerns that the delay might cause the project to be <br />impacted by winter weather, We believe these adjustments are reasonable, and are <br />justified in accordance with the "good cause" provision of the Order. <br />Please consider this a request for extension in accordance with Paragraph 8 of <br />page 6 of the CAO. Please transmit this request for approval by the Executive Officer <br />with jurisdiction over this project. The requested schedule revisions areas follows: <br />Item 7: `By 22 June 2006, the Discharger shall begin construction on the Foothill <br />Landfill Site Improvement Project." <br />Item 8: `By 1 December 2006, the Discharger shall have substantially completed <br />construction of the Foothill Landfill Site Improvement Project. This date is contingent <br />upon no delays due to weather. This date shall be extended due to weather delays as <br />requested by the Contractor and approved by the County. <br />Item 9: `By 15 January 2007, or six weeks after completion of Item 8, whichever comes <br />later, the Discharger shall submit a Construction Quality Assurance Certification Report, <br />as prepared by at third party CQA officer. <br />Please let me know if you have any questions or require additional information, and we <br />will respond immediately. <br />Sincerely, <br />,�� 4�z`� <br />W. MICHAEL CARROLL, PE <br />Senior Civil Engineer <br />WMC:sw <br />N:\t�oothill\SilelmpProj061MVJhiteOl-TimeEuln spl reva.doc <br />c: Robert <br />McClellon, Environmental Health Department <br />Tim Crandall, ICleinfelder Inc. <br />Sangeeta Lewis, Lewis Engineering <br />Dan Waineo, GC Environmental <br />LA 63107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.