Laserfiche WebLink
W. Michael Carroll - 2 - 13 December 2005 <br /> San Joaquin County <br /> not submitted by these proposed dates,then staff may consider enforcement action using the <br /> original dates as outlined in the CAO. <br /> At least 90 days prior to construction,please submit a revised CQA and Design Plan that addresses the <br /> following: <br /> 1. Design change and specifications of the barrier liner. <br /> 2. The new location, construction specifications and design drawings for the ET cover and test pad. <br /> 3. Comments to staff's letter dated 28 September 2005. <br /> If you have any questions,please call me at 916-464-4676 or email me at: mwhite@waterboards.ca.gov. <br /> 1,7 <br /> MOL .. WHITE <br /> Water Resources Control Engineer <br /> San Joaquin River Watershed <br /> cc: Robert McClellan, San Joaquin County Environmental Health Division, Stockton <br /> Keith Kennedy, Permitting and Enforcement Division, CIWMB, Sacramento <br /> Mr. Tim Crandall, Kleinfelder, Inc., Sacramento <br />