My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2023 10:04:47 AM
Creation date
1/3/2022 8:44:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by Manufacturer ✓ Industry Standard Professional Engineer <br /> Test Type Pressure 1,( Vacuum JHydrostatic <br /> Test Equipment Used:Vacuum Gauge <br /> Tank ID 87-1 87-1/91 <br /> Tank Manufacturer Xerxes Xerxes <br /> Tank Capacity Dnk. unk. <br /> Test Start Time 9:10AM 9:20AM <br /> Initial Reading -10psi -iopsi <br /> Test End Time 10:10AM 10:z0AM <br /> Final Reading -iopsi -10psi <br /> Change in Reading opsi oapi <br /> Pass/Fail Criteria +/- opsi +/- opsi <br /> Tightness Test Results ✓ Pas Fai! Pass Fail Pass Fail Pass Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by Manufacturer ✓ industry Standard Professional Engineer <br /> Test Type ✓ Pressure Vacuum Hydrostatic <br /> Test Equipment Used:Pressure Gauge <br /> Pipe Run ID 87 91 DSL <br /> Pipe Manufacturer Smith Smith Smith <br /> Test Start Time 8:3oAM 0:3SAM <br /> Initial Reading spsi spsi <br /> Test End Time 9:3OAM 9:3SAM <br /> Fina! Reading spsi Spsi <br /> Change in Reading opsi Opsi <br /> ass ail Criteria +/- Opsi +/- opsi <br /> Tightness Test Results j[—]Passl jFacil I IPasslFail 11 ✓ jPassj rail I jPassjFail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results I JPassjFail Pass ailPass IFail Pas Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.