Laserfiche WebLink
TABLE 2-1 (CONTINUED). SUMMARY OF POTENTIAL IMPACTS AND <br />MITIGATION MEASURES <br />IMPACTS <br />(Significance) <br />3.5 HYDROLOGY AND DRAINAGE <br />Development of the project site <br />and study area would result in an <br />incremental increase in runoff and <br />flooding because of the increase <br />in impervious surfaces on site. <br />(PS) <br />B Beneficial impact <br />NS No Significant impact <br />MITIGATION MEASURES <br />(Significance After Mitigation) <br />A Neighborhood Watch Program may be <br />organized by residents of the develop- <br />ment to provide a greater measure of <br />security for the neighborhood. <br />The Tracy Rural Fire District should <br />consider collecting fees from the <br />developer on a per parcel basis to <br />offset costs to provide fire protection <br />for residential development. <br />The Tracy Rural Fire District should <br />seek additional volunteer firefighters <br />to staff Station 4. <br />The developer should install fire <br />hydrants in the project area to conform <br />to County and Fire District standards. <br />Consideration should be given to the <br />formation of a Community Facility <br />District under the Mello -Roos bill. <br />The developer should contribute to the <br />costs associated with roadway widening <br />of Fairoaks and MacArthur Roads. (NS) <br />Roadway designs should consider and <br />not impede existing surface runoff <br />drainage patterns. <br />Retention basins should be implemented <br />at terminal drainage sites within the <br />study area and designed to ensure <br />adequate capacity to accommodate <br />additional runoff generated by future <br />area buildout. (NS) <br />2-4 <br />PS Potentially Significant impact <br />S Significant impact <br />(CONTINUED) <br />