Laserfiche WebLink
SU-87-12 page 3 <br /> 8 . The revised Tentative Map submitted with the full application <br /> should include the following additional information: tract <br /> number; ground elevations (spot elevations or contour lines) ; <br /> location of water, sewer and storm drainage mains and where <br /> they tie to existing mains; public utility easements; and <br /> street cross-section. Also, all four property owners should <br /> sign the map. <br /> 9. In conjunction with the full application, a preliminary soils <br /> report will be required. Depth to groundwater should be <br /> included in that report. <br /> BB:jdh <br />