My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014634
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
0
>
2600 - Land Use Program
>
S-85-1
>
SU0014634
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:19 PM
Creation date
1/4/2022 11:05:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014634
PE
2600
FACILITY_NAME
S-85-1
STREET_NUMBER
0
STREET_NAME
STATE ROUTE 12
City
LODI
APN
02510005
ENTERED_DATE
12/13/2021 12:00:00 AM
SITE_LOCATION
HWY 12
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 1 <br />PC: 4-18-85 <br />5-85-1 <br />Page 3 <br />CONDITIONS <br />MAJOR SUBDIVISION APPLICATION NO. S-85-1 <br />GIBRALTER COMMUNITY BUILDERS <br />Planning Division: <br />1. The applicant shall receive appropriate permits/permission <br />from CalTrans for the proposed access of Pommel Lane onto <br />Highway 12. <br />2. A landscaping plan shall be submitted for approval by the <br />Director of Planning. <br />3. All structures used for public assembly, restaurants, motels, <br />and hotels or other type of residential occupancy shall be <br />protected with automatic fire sprinkler systems. Fire pro- <br />tection is to be provided by a public agency subject to <br />approval of the type and method by the Board of Supervisors <br />prior to approval of the Final Map. <br />4. This map is approved for three years (to expire on December <br />6, 1984). <br />5. A preliminary soils report shall be submitted. <br />Public Works Department: <br />1. Construct frontage improvements along Thornton Road (100' <br />right-of-way), including pavement and P.C.C. curb, gutter, and <br />sidewalk in accordance with Sections 9-9301, 9-9309, and <br />9-9352 of the Ordinance Code, and Public Works Standard No. <br />B-2 for an 84' right-of-way street. <br />2. Construct full frontage improvements along De Broggi Road <br />(100' and 80 rights-of-way), including 60' pavement and P.C.C. <br />curb, gutter, and sidewalk on the subdivided side, in accor- <br />dance with Section 9-9301 and 9-9352 of the Ordinance Code, <br />and Public Works Standard No. B-2 for an 84' right-of-way <br />street. Dedicate a 2' right-of-way on the subdivided side to <br />obtain the minimum half -width standard of 42'. <br />3. Construct full street improvements for Pommel Lane, including <br />a 60' pavement and P.C.C. curbs, gutters, and sidewalks in <br />accordance with Sections 9-9301 and 9-9352 of the Ordinance <br />Code, and Public Works Standard No. B-2 for an 84' right-of- <br />way street. The right-of-way for Pommel Lane should be 841, <br />and the minimum centerline radius should be 1000' per <br />
The URL can be used to link to this page
Your browser does not support the video tag.