My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2003-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2003-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:06:51 AM
Creation date
1/4/2022 2:12:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2003-2004
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
305
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,e <br /> 4 <br /> PqU I ry_ <br /> THOMAS R. FLINN P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> DIRECTOR STOCKTON,CALIFORNIA 95201-3018 <br /> (209)468-3000 FAX(209)468-2999 <br /> F <br /> �4<, oaNr . ;.., www.co.san-joaquin.ca.us <br /> THOMAS M.GAU <br /> DEPUTY DIRECTOR <br /> MANUEL SOLORIO warymg for YOU <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER m Ec�FRYED <br /> DEPUTY DIRECTOR <br /> BENTON ANGOVE c1 <br /> BUSINESS ADMINISTRATOR March 23, 2004 (� <br /> 2004 <br /> EN <br /> Ms.Kim Schwab <br /> p pMIT/SERVICES <br /> California Regional Water Quality Control Board <br /> 11020 Sun Center Drive, #200 <br /> Rancho Cordova, California 95820-6114 <br /> SUBJECT: SITE IMPROVEMENT PROJECT,FOOTHILL SANITARY LANDFILL <br /> Dear Ms. Schwab: <br /> Attached is the proposed Site Improvement Project for the Foothill Landfill, revising the project <br /> originally proposed in our letter dated January 16, 2004. As requested,this proposal includes a single <br /> Project Design Report containing the core design features to be submitted for RWQCB review. <br /> This proposal includes a schedule for the project, identifying activities by the parties involved. If all goes <br /> well,the project can be completed by end of the 2006 construction season. I am sure you understand our <br /> reluctance to make a firm commitment to a 2006 completion date when so much of the critical path lies <br /> beyond the County's control. Perhaps you remember that the County originally proposed completion in <br /> 2007,a commitment we can make unequivocally. <br /> Nevertheless, we intend to complete construction as shown in the schedule. To that end,we have begun <br /> the first step; an RFP for engineering services for this project. <br /> If you have any questions,please call me at(209)468-3066. <br /> Sincerely, <br /> W. MICHAEL CARROLL,PE <br /> Senior Civil Engineer <br /> WMC:sc <br /> NA Foothill\Groundwater Monitoring\Compliance Issues\KSchwab03-Strategy.doc <br /> Attachment <br /> c: Larry Meyers,Deputy County Counsel <br /> Kristen Castanos, Somach, Simmons and Dunn <br /> rt McCleilon,Environmental Health Department <br /> LA 10640D <br />
The URL can be used to link to this page
Your browser does not support the video tag.