Laserfiche WebLink
CLEANUP AND ABA MENT ORDER NO. R5-2004-0706 2 <br /> COUNTY OF SAN JOAQUIN AND FOOTHILL SANITARY LANDFILL, INC. <br /> CALAVERAS COUNTY <br /> contain a detailed description of the technologically and economically feasible corrective <br /> action measures that could be taken to achieve background concentrations for all Constituents <br /> of Concern. <br /> ENFORCEMENT HISTORY <br /> 7. On November 6, 2002, the Discharger submitted an Evaluation Monitoring Plan,which <br /> describes the criteria for delineating the nature and extent of groundwater pollution. Because <br /> Module "I" is unlined and presumed to be a source of waste discharges, the WDRs require the <br /> closure of Module "I" as part of the corrective action measures. <br /> 8. WDRs Order No. R5-2003-0020, Provision J.12, requires that the Discharger submit on 1 June <br /> 2003, the Engineering Feasibility Study report, which includes closure of Module "I". The <br /> Discharger did not submit the document by the date of compliance. <br /> 9. On 16 September 2003, the Executive Officer issued a CWC 13267 Order requiring the <br /> Discharger to submit two reports, including(a) the Engineering Feasibility Study report, <br /> which includes the closure of Module"I", required by the WDRs and (b) a Partial Cover <br /> workplan, which includes design and construction of the soil cover for all modules in the Unit <br /> and addresses the performance standards for precipitation and drainage controls. The WDRs <br /> required the reports be submitted on 1 June 2003. The CWC 13267 Order required the <br /> documents to be submitted on 1 November 2003. <br /> 10. On 30 October 2003, the Discharger submitted the Partial Cover workplan and the <br /> Engineering Feasibility Study Report and Corrective Action Program. These documents did <br /> not include a closure plan for Module "I" in compliance with WDRs Order No. R5-2003-0020 <br /> or Title 27 CCR. <br /> 11. On 16 December 2003, the Executive Officer issued an Administrative Civil Liability <br /> Complaint (ACLC)No. R5-2003-0159 in the amount of$10,000 for non-submittal of(a)the <br /> Engineering Feasibility Study report including the closure of Module "I", as required by the <br /> WDRs, and (b) a Partial Cover workplan including specifications for design and construction <br /> of the soil cover for all modules in the Unit and specifies the performance standards for <br /> precipitation and drainage controls; in compliance with closure standards set forth in WDRs <br /> and Title 27 CCR. <br /> 12. The Executive Officer and Discharger entered into a settlement discussion and agreed to <br /> resolve by consent and without further administrative proceedings the alleged violations of the <br /> CWC and WDRs. The Discharger agreed to pay$10,000 in proposed civil liability and the <br /> Executive Officer agreed to revise the ACLC No. R5-2003-0159 (the new order is ACLC No. <br /> R5-2004-0520). The Discharger further agreed to accept CAO R5-2004-0706,which is <br /> intended to address releases from Module "I," and the Executive Officer agreed, if landfill gas <br /> releases are successfully eliminated, to recommend a modification of WDRs Order No. R5- <br />