My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2003-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2003-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:06:51 AM
Creation date
1/4/2022 2:12:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2003-2004
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
305
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THOMAS R. FLINN P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> DIRECTOR STOCKTON,CALIFORNIA 95201-3018 <br /> (209)468-3000 FAX(209)468-2999 <br /> cFORT' <br /> www.co.san-joaquin.ca.us <br /> THOMAS M.GAU } <br /> DEPUTY DIRECTOR <br /> MANUEL SOLORIO Wwldn <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> BENTON ANGOVE <br /> BUSINESS ADMINISTRATOR November 15, 2004 <br /> RDE C <br /> Ms. Kim Schwab N O V 17 2004 <br /> California Regional Water Quality Control Board <br /> 11020 Sun Center Drive, #200 ENVIRONMENT HEALTH <br /> Rancho Cordova, California 95820-6114 PERMIT/SERVICES <br /> SUBJECT: PARTIAL COVER AND EROSION CONTROL PLAN <br /> FOOTHILL SANITARY LANDFILL, CAO R5-2004-0706 <br /> Dear Ms. Schwab: <br /> Attached is the Partial Cover, Intermediate Cover, and Drainage and Erosion Control Plan for <br /> the Foothill Sanitary Landfill,which is Item No.3 of the Cleanup and Abatement Order(CAO). <br /> This Plan contains the procedure to investigate and improve the present cover,whether for <br /> intermediate cover or long-term Partial Cover. The Plan also identifies the improvements to the <br /> drainage features including drainage ditches and down drains. The County will be working with <br /> the site operator to verify and improve the landfill cover as needed in 2005. Drainage features <br /> may also be improved at that time, or they may be incorporated into the larger Site Improvement <br /> Project. <br /> Please call me at(209) 468-8504 with any questions, <br /> Sincerely, <br /> W.MICHAEL CARROLL,PE <br /> Senior Civil Engineer <br /> WMC:sc <br /> N:\1Foothill\SitelmpProj06\KSchwab04-PartCovrNDrainR2.doc <br /> Enclosure �.�•+ V <br /> c: Robert McClellon,Environmental Health Department r �� <br /> 1 � <br /> LA 10640D <br />
The URL can be used to link to this page
Your browser does not support the video tag.