Laserfiche WebLink
THOMAS R. FLINN <br />DIRECTOR <br />c4 is i F�i/ <br />THOMAS M. GAU <br />DEPUTY DIRECTOR <br />MANUEL SOLORIO <br />DEPUTY DIRECTOR <br />STEVEN WINKLER <br />DEPUTY DIRECTOR <br />BENTON ANGOVE <br />BUSINESS ADMINISTRATOR <br />Ms. Kim Schwab <br />r. 4 <br />g fm YOU <br />November 15, 2004 <br />California Regional Water Quality Control Board <br />11020 Sun Center Drive, #200 <br />Rancho Cordova, California 95820-6114 <br />u <br />P. O. BOX 1810 - 1810 E. HAZELTON AVENUE <br />STOCKTON, CALIFORNIA 95201-3018 <br />(209) 468-3000 FAX (209) 468-2999 <br />www.co-san-joaquin.ca.us <br />SUBJECT: PARTIAL COVER AND EROSION CONTROL PLAN <br />FOOTHILL SANITARY LANDFILL, CAO R5-2004-0706 <br />Dear Ms. Schwab: <br />Attached is the Partial Cover, Intermediate Cover, and Drainage and Erosion Control Plan for <br />the Foothill Sanitary Landfill, which is Item No.3 of the Cleanup and Abatement Order (CAO). <br />This Plan contains the procedure to investigate and improve the present cover, whether for <br />intermediate cover or long-term Partial Cover. The Plan also identifies the improvements to the <br />drainage features including drainage ditches and down drains. The County will be working with <br />the site operator to verify and improve the landfill cover as needed in 2005. Drainage features <br />may also be improved at that time, or they may be incorporated into the larger Site Improvement <br />Proj ect. <br />Please call me at (209) 468-8504 with any questions, <br />Sincerely, <br />W. MICHAEL CARROLL, PE <br />Senior Civil Engineer <br />WMC:sc <br />N:\1 Foothill\SitelmpProj06\KSchwabO4-PartCovrNDrain R2.doc <br />Enclosure <br />c: Robert McClellon, Environmental Health Department <br />1•�1[t <br />