Laserfiche WebLink
PQU.Iry <br /> THOMAS R. FLINN P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> STOCKTON,CALIFORNIA 95201 <br /> DIRECTOR (209)468-3000 FAX(209)468-2999 <br /> c°c,FoaN P www.co.san-joaquin.ca.us <br /> THOMAS M.GAU <br /> DEPUTY DIRECTOR <br /> JED)r�� <br /> MANUEL SOLORIO YOU �7 j <br /> DEPUTY DIRECTOR p <br /> STEVEN WINKLER JUN 1 6 200.7y <br /> DEPUTY DIRECTOR <br /> BENTON ANGOVE ENVIRONMEN i I IEiw_T(- <br /> BUSINESS ADMINISTRATOR June 12, 2003 <br /> PERMIT/SERVICES <br /> Mr. Robert McClellon, REHS <br /> Environmental Health Department <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, California 95202 <br /> SUBJECT: NORTH SIDE INSPECTION ROAD, FOOTHILL SANITARY LANDFILL <br /> Dear Mr. McClellon: <br /> This letter is in response to a request by Michael Kith that Foothill Landfill provide a road to <br /> allow travel around the north side of the landfill. I visited the site on June 12, 2003, and <br /> discussed this issue with Jesse Padilla, site foreman. Jesse agreed to scrape the weeds in a path <br /> along the north side of the fence on the north side of the fill area, move the fence further north <br /> such that fence encloses the new path(figure attached), and provide culverts at the eastern end of <br /> the new path so that the drainage ditch may be crossed. Jesse would also place surfacing <br /> material (rock, sand, or equivalent) on the new path to allow access during wet weather. <br /> Note that this work will be done incrementally as equipment and manpower availability permits, <br /> however, we can expect the path to be scraped and passable by mid-July, and the surfacing for <br /> wet weather access to be in place prior to the rains. <br /> I believe this approach addresses Michael Kith's concern for inspection along the north side of <br /> fill area, and Foothill Landfill's concern for the potential for grass fires and the cost of such a <br /> road. <br /> If you have any questions about this planned construction or any other issue, please call me at <br /> 468-3066. <br /> l <br /> Sincerely, <br /> W. MICHAEL CARROLL, PE <br /> Senior Civil Engineer <br /> WMC:mr <br /> N:\1 Foothill\RMcClellon03-Road.doc <br /> Attachment <br /> c: Jesse Padilla, Foothill Landfill <br /> LA 31102 <br />