My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1994-1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_1994-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:07:22 AM
Creation date
1/4/2022 2:17:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1994-1995
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I qN <br />E <br />Carol Oz <br />March 14, 1995 <br />Page 2 <br />Response <br />All future landfill modules will have liners meeting the criteria <br />of Subtitle D, and will be approved by the Regional Water Quality <br />Control Board. The subject project does not change the types of <br />waste to be received, so the project has no impact on liner <br />requirements. <br />Comment 3 <br />"In your Project Description it states bulk recyclable materials <br />will be stored on site for up to six months. This time period <br />has not been approved for any Solid Waste Facility in San Joaquin <br />County." <br />Response <br />The adopted Mitigated Negative Declaration (October 1992) for the <br />Solid Waste and Household Hazardous Waste Recycling Programs at <br />the North County Recycling Center and Sanitary Landfill states <br />that bulk materials would be stored on-site for a maximum of six <br />months. The same maximum time period is appropriate for the FSL <br />Recycling Project. <br />Comment 4 <br />"What type of worker safety training for the recycling project <br />will occur?" <br />Personnel at the FSL will be trained on an as -needed basis by <br />personnel from the North county Recycling Center and Sanitary <br />Landfill. Safety meetings will be held weekly at the FSL to <br />address safety in handling the increased quantities and <br />recyclables. <br />Comment 5 <br />"What measures for dust, traffic, and noise control will be <br />taken?" <br />Response <br />Please refer to the mitigation/monitoring plan for measures to be <br />taken to control particulate matter and traffic. A copy is <br />attached for your information. As stated in the Negative <br />
The URL can be used to link to this page
Your browser does not support the video tag.