My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2010-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2010-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:05:58 AM
Creation date
1/4/2022 2:26:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2010-2013
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> CONTENTS <br /> 1.0 GENERAL............................................................................................................................... 1 <br /> 1.1 PURPOSE......................................................................................................................................1 <br /> 1.2 SITE DESCRIPTION ......................................................................................................................1 <br /> 1.3 WELL LOCATION...........................................................................................................................1 <br /> 2.0 EXECUTION ...........................................................................................................................2 <br /> 2.1 CONSTRUCTION SCHEDULE......................................................................................................2 <br /> 2.2 PERMITS........................................................................................................................................2 <br /> 2.3 INSPECTION..................................................................................................................................2 <br /> 2.4 DRILLING.......................................................................................................................................2 <br /> 2.5 WELL CONSTRUCTION................................................................................................................2 <br /> A. UNCOMPLETED BORINGS...........................................................................................................2 <br /> B. ABANDONED BORINGS...............................................................................................................3 <br /> 2.6 WELL CONNECTION.....................................................................................................................3 <br /> A. EQUIPMENT..................................................................................................................................3 <br /> 3.0 HEALTH AND SAFETY PLAN................................................................................................3 <br /> 3.1 RESPONSIBILITY FOR SAFETY...................................................................................................3 <br /> 3.2 WORKING CONDITIONS...............................................................................................................4 <br /> A. REFUSE.........................................................................................................................................4 <br /> B. LANDFILL GAS(LFG)....................................................................................................................4 <br /> 3.3 SAFETY PROCEDURES................................................................................................................5 <br /> A. REFUSE HANDLING......................................................................................................................5 <br /> B. GENERAL SAFETY........................................................................................................................5 <br /> FIGURES <br /> Figure A: Well Location Map <br /> Figure 1-3: Construction Drawings <br /> APPENDIX <br /> Well Specifications <br /> Work Plan Foothill Sanitary Landfill <br /> Replacement LFG Extraction Well Installation-2011 i <br />
The URL can be used to link to this page
Your browser does not support the video tag.