My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2010-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2010-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:05:58 AM
Creation date
1/4/2022 2:26:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2010-2013
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and to prevent LFG escaping into the atmosphere. Either a 8'x4'x 1/2" <br /> inch thick sheet of plywood with weights will be placed over the borehole <br /> or the drilling auger may be left in the borehole with its top covered. The <br /> drilling area will be cordoned off with safety cones and caution tape. <br /> B. ABANDONED BORINGS <br /> In the following circumstances a boring will be abandoned: <br /> 1. If drilling becomes difficult or an obstruction is encountered <br /> 2. Not enough refuse is found in the area <br /> 3. Any adverse conditions <br /> Abandoned borings will be backfilled as follows: <br /> • In the refuse: Backfilled with clean soil moistened and compacted in <br /> two-foot lifts. <br /> • In Soil: Backfilled with cement slurry <br /> 2.6 WELL CONNECTION <br /> The new LFG extraction well will be connected to the existing 3-inch <br /> diameter HDPE lateral pipe (Figure A). The existing lateral is installed <br /> on the surface. The lateral of the old well GX-2 will be caped to prevent <br /> LFG escape. <br /> A. EQUIPMENT <br /> Ford Construction will provide all necessary equipment for this project. <br /> It is anticipated that an excavator mounted drill rig will be used for <br /> drilling. <br /> 3.0 HEALTH AND SAFETY PLAN <br /> 3.1 RESPONSIBILITY FOR SAFETY <br /> The Contractor (Ford Construction) will ensure that work procedures meet <br /> all applicable safety requirements. The Contractor is solely and wholly <br /> responsible for the safety of his workers during this project. The Contrator <br /> will conduct a safety meeting at the start of this project. <br /> Work Plan Foothill Sanitary Landfill <br /> Replacement LFG Extraction Well Installation_2011 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.