Laserfiche WebLink
2.0 EXECUTION <br /> 2.1 CONSTRUCTION SCHEDULE <br /> Installation of the new LFG extraction wells will be scheduled after drilling <br /> permit approval. The work is expected to be completed in three (3) working <br /> days. Work hours will be Monday to Friday from 8:00 am to 5:00 pm. <br /> 2.2 PERMITS <br /> Ford Construction Inc will obtain drilling permits from San Joaquin County <br /> Environmental Health Department (EHD). <br /> 2.3 INSPECTION <br /> Ford Construction's project Forman will notify EHD's Unit 6 lead inspector <br /> at least five (5) working days in advance for the first inspection. <br /> Consecutive required inspections for the project will be then be scheduled <br /> and coordinated with EHD's inspector in the field accordingly based on the <br /> progress of the construction and EHD's working hours. <br /> Inspection notification will be made to EHD for the following work: <br /> • Well Installation <br /> • Abandoned boring backfill. <br /> 2.4 DRILLING <br /> Drilling of the wells will be by a licensed drilling Contractor. The well will be <br /> drilled 10 feet below the base of the unlined module into native soil. <br /> The drill cuttings while drilling will mostly be refuse. Refuse and soil with <br /> refuse from the drilling will be disposed at the active working area of the <br /> landfill. <br /> 2.5 WELL CONSTRUCTION <br /> It is anticipated that the LFG extraction well will be constructed immediately <br /> after drilling. A draft well completion log will be complied during well <br /> completion. <br /> A. UNCOMPLETED BORINGS <br /> If a well borehole is not drilled by the end of the day and is to be left <br /> open, the well borehole opening will then be securely covered for safety <br /> Work Plan Foothill Sanitary Landfill <br /> Replacement LFG Extraction Well Installation-2011 2 <br />