Laserfiche WebLink
G. Abandon LFG Well In Refuse <br /> a. Payment for abandoning a LFG well within the refuse will be paid per liner foot <br /> as identified in the Bid Sheet. <br /> b. Payment includes drilling to the desired depth, removing refuse, placing and <br /> compacting soil. <br /> H. Abandon LFG Well Outside Refuse <br /> a. Payment for abandoning a'LFG outside the refuse footprint will be paid per <br /> liner foot installed at the price identified in the bid sheet. <br /> b. Payment includes drilling to the desired depth, removing soil, and placing fill <br /> material as identified. <br /> 1.3-Inch HDPE Pipe <br /> a. Installing 3-inch HDPE pipe will be paid per liner foot installed at the price <br /> identified in the bid sheet. <br /> b. Payment includes pipe, welding, and associated fittings. This payment does <br /> not include trenching. <br /> J. 4-Inch HDPE Pipe <br /> a. 4-inch HDPE pipe will be paid per liner foot installed at the price identified in <br /> the bid sheet. <br /> b. Payment includes pipe, welding, and associated fittings. <br /> K. Trench - Shallow <br /> a. Trench will be paid per linear foot at the price identified in the Bid Sheet. <br /> b. Payment includes trench excavation, sand bedding, and placement of required <br /> HDPE pipe in trench, placement of marker tape, soil backfill with compaction <br /> and leveling soil to match existing surface grade. <br /> L. 3-Inch Gate Valve <br /> a. 3-inch gate valve will be paid per unit installed at the price identified in the Bid <br /> Sheet. <br /> b. Payment includes valve, bolts, nuts and washers, sampling valve, and <br /> associated fittings. <br /> FH-LFG well Installation GX-2A 11 Revised 6-14-11 <br />