My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COVWXIZZG (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
ST ANDREWS
>
3603
>
2500 – Emergency Response Program
>
COVWXIZZG (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2022 11:42:36 AM
Creation date
1/5/2022 11:40:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2500 – Emergency Response Program
RECORD_ID
COVWXIZZG
PE
2546
STREET_NUMBER
3603
STREET_NAME
ST ANDREWS
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
11821011
ENTERED_DATE
3/22/2021 12:00:00 AM
SITE_LOCATION
3603 ST ANDREWS DR
RECEIVED_DATE
3/22/2021 12:00:00 AM
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\ymoreno
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Complaint Investigation Summary Report #. 5105 <br />COMPLAINT ID: COVWXIZZG Site Location: 3603 ST ANDREWS DR <br />Activity Date <br />Activity Summary <br />Recorded by <br />03/27/2021 11:23 AM Left message requesting cleanup status from Dave Larsen (PG&E) at: MURO <br />916-897-6779. <br />1:33 PM Dave Larsen called to advise that cleanup is complete. <br />1:52 PM En route to spill cleanup. Arrived at 2:26 PM. Met with Dave Larsen and <br />Zach (Clean Harbors). <br />The oil-contaminated soil was removed by excavation. One 55-gallon drum of <br />non-hazardous waste oil-contaminated soil was generated and will be taken to the <br />4044 West Lane facility pending disposal. The cement pad was power-washed <br />and all rinsate was collected. Approximately 30 gallons of non-hazardous liquid <br />was generated and will also be taken to 4044 West Lane facility pending disposal. <br />Site was adequately cleaned up as no oil staining or odor were detected. <br />2:46 PM Left site: <br />3:20 PM Arrived Home. <br />Completed site map and Emergency Response Record. <br />Emailed photos to myself for photo log. Began photo log. <br />03/31/2021 Date/Time-stamped photos. MURO <br />09/23/2021 Reviewed complaint in preparation for abatement procedure. Gathered documents <br />and generated list of items still required for abatement. <br />MURO <br />10/07/2021 Completed narrative for site visit on 3-27-2021 using my notes. MURO <br />10/12/2021 Prepared file for abatement review for Lead Senior Elena Manzo. MURO <br />5105.rpt Page 3 of 3
The URL can be used to link to this page
Your browser does not support the video tag.