My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
420
>
2300 - Underground Storage Tank Program
>
PR0544259
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2022 9:43:41 AM
Creation date
1/6/2022 9:07:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0544259
PE
2361
FACILITY_ID
FA0024739
FACILITY_NAME
TOKAY SHELL
STREET_NUMBER
420
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06202042
CURRENT_STATUS
01
SITE_LOCATION
420 W KETTLEMAN LN # 1
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> Underground Storage Tank <br /> Monitoring System Certification Form JAN 0 7 2022 <br /> ENVIRONMENTAL <br /> 7x LINE LEAK DETECTOR TESTING HEALTH DEPARTM NT <br /> ❑ Check this box if line leak detectors ARE NOT installed . (Do not complete this section. ) <br /> Simulated release rate verified : ( Check all that apply . ) Yes No NA <br /> El 3 GPH ❑ 0 . 1 GPH ❑ 0 . 2 GPH <br /> Has the testing apparatus been properly calibrated ? 0 ❑ ❑ <br /> For emergency generator tank systems , does the LLD create an audible and visual ❑ ❑ F7 <br /> alarm when a leak is detected ? <br /> For mechanical LLDs , does the LLD restrict the flow through the pipe when a 177 ❑ <br /> release is detected ? <br /> For electronic LLDs , does the turbine automatically shut off when a release is ❑ ❑ 177 <br /> detected ? <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the ❑ El 0 <br /> monitoring system is disabled or disconnected ? <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the F1 F 0 <br /> monitoring system malfunctions or fails a tightness test? <br /> For electronic LLDs , have all accessible wiring connections been visually inspected 171 ❑ <br /> El <br /> for kinks and breaks? <br /> Were all items on the equipment manufacturer' s maintenance checklist completed ? ❑ ❑ 1771 <br /> Were all LLDs confirmed operational within regulatory requirements ? T�01 ❑ ❑ <br /> LLD ID LLD Model Lines Monitored Pass Fail <br /> ❑ ❑ <br /> ❑ ❑ <br /> ® ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ <br /> ]EI <br /> Describe all answers marked "No " or "Fail" and proposed remedy in Section 9. <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.