My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
420
>
2300 - Underground Storage Tank Program
>
PR0544259
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2022 9:43:41 AM
Creation date
1/6/2022 9:07:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0544259
PE
2361
FACILITY_ID
FA0024739
FACILITY_NAME
TOKAY SHELL
STREET_NUMBER
420
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06202042
CURRENT_STATUS
01
SITE_LOCATION
420 W KETTLEMAN LN # 1
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank RECEIVED <br /> Monitoring System Certification Form JAN 0 7 2022 <br /> 8 IN TANK GAUGING TESTING HEALTH DEPARTMEN <br /> O Check this box if tank gauging is used only for inventory control . <br /> ❑ Check this box if NO tank gauging equipment is installed . Yes No NA <br /> Do not complete this section if either box is checked. <br /> All wiring has been : 1 ) visually inspected for kinks , breaks and proper entry and ❑ ❑ ❑ <br /> termination ; and 2 tested for ground faults? <br /> Were all in -tank gauging probes visually inspected for damage and residue buildup El El 11to ensure that floats move freely , functional ) tested , and confirmed operational . <br /> Was accuracy of system ' s product level readings tested ? ❑ ❑ ❑ <br /> Was accuracy of system ' s water level readings tested ? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer' s maintenance checklist completed ? ❑ ❑ 1 ❑ <br /> Probe ID Probe Model Tanks Monitored Pass Fail <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> 9 COMMENTS <br /> Describe all answers marked "No " or "Fail" and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.