Laserfiche WebLink
UNDERGROUND'STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (page s of 5 <br /> XII. LINE;LEAKDETECTOR TESTING <br /> ❑Check this box if line leak detectors(LLD)are NOT installed,(Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? <br /> (Check all that apply,) Simulated leak rate verified: 0 3 GPH 0.1 GPH ❑ 0.2 GPH 0 El D <br /> Was the testing apparatus properly calibrated? 0 <br /> For emergency generator tank systems,does the LLD create an audible and visual alarm when a leak Is detected? E] El <br /> For mechanical LLDs,does the LLD restrict the flow through the pipe when a leak is detected? 0 El 21 <br /> For electronic LLDs,do as the turbine automatically shut off when a leak is detected? E <br /> 191 <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? E Q <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? E-] 21 <br /> For electronic LLDs,have all accessible wiring connections been visually inspected for kinks and breaks? 1:1 El Z <br /> Were all items on the equipment manufacturer's maintenance checklist completed? a L] El <br /> Were all LLDs confirmed operational within regulatory requirements? <br /> For any answer of"N"above,describe in Section Xlll how and when these issues were or will be corrected. <br /> .. .... .. .. . . <br /> XIII. COMMENTS+ <br /> XIV. VACUUM/PRESSURE/HYDROSTATIC MONITORING;EQUIPMENT'TESTING <br /> XQ Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type(Mark all that apply.) ❑Vacuum ❑Pressure ❑Hydrostatic <br /> Sensor ID Component(S)Monitored By This Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> ❑Pass ❑Fail ❑Pass []Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> [:1Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> How was interstitial communication verified? []Simulated Leak at Far Ends of the Interstitial Space ❑Visual Inspection <br /> Other(Describe the method in section XV below.) Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? El Yes ❑No(Describe the reason in section XV below.) <br /> For any answer of"Fail'above,describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH=Gallons Per Hour,Y=Yes,N=No,NA=Not Applicable,VPH=Vac txmvPresstxefl c rostat q 10 Identification <br />