Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Pae s of s) <br /> XVI. MONITORING SITE PLAN <br /> Fsite was prepared; <br /> If you already have a site plan that shows all required information,you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault;4)devices monitoring product piping;5)devices monitoring fill piping;6)devices monitoring vent piping;7)devices <br /> monitoring vapor recovery piping;S) devices monitoring ventAransition sumps;9)devices monitoring under-dispenser containment; 10) <br /> line leak detectors;and 11)devices monitoring any other secondary containment areas, <br /> U ST Monitoring Sita Plan <br /> _... - -- <br /> arte Address, VOP-RIPON CFH 8113 S.FRONTAGE ROAD RIPON CA95SM <br /> CAS Wr <br /> / - HOUSE . . . . <br /> . . <br /> 9 0 P �J <br /> 87. X P X P <br /> _ a w <br /> l GO <br /> *PfPI15rG+ <br /> KEF <br /> mains ofpi . . . . . . . . . . . . . . . A=xgnmu Sensor <br /> Dntvittg ofpiping , <br /> w4l ofaump and F=FILLS <br /> U)C*X.No . . . . . V-17A OR <br /> urdesground <br /> . - P=PROSE <br /> drawing is I . . . . . . . . L=Turbine 1 Leak Detector <br /> accurate,the . . . . . . . . . . . k=SU«SENSOR <br /> cannot speculate B-Brine Sessor <br /> blue prints. AAA*items ua w1 round that are not"isibl s to the cestL4 Mg tecbniciaa are x S=Smart Sensor <br /> professional opinion CM4.and are solelg for informational purposes.d5ming not to C=Floats&Ciaias <br /> scale. E=E Stop <br /> Date map vial drawnptimis <br /> Instmetions <br /> Uou akeady have a diagram that shows al required information,you may include it.rather than this page,with your Monitoring System Certvfication. On your site plan, <br /> .the general layout of tanks and piping. Ctearty klen*locations of the foflowinp equipment.if kistalled mon toOig system control panels;sensors monitoring tank <br /> annular spaces,sumps.dispenser pans.spill containers,or other seccrdarf conta;+trent areas:mechanical or a*ctron,tine leak detectors:and in-lank liquid level <br /> probes(d used for leak deteaton)_ In the space provided.note the date this Site Plan was prepared. <br /> LEGEND <br />