Laserfiche WebLink
SECTION 01730 -SOIL GAS WELL <br />A Contractor shall over drill existing soil gas wells as shown on the plans and then install <br />the soil gas well as specified in the plans and herein. <br />B Contractor should use Air Rotary or equivalent method for drilling soil gas wells. <br />C Existing wells' boring logs are included in the bid package for reference. <br />1.01 SUBMITTALS <br />A Submit sieve test results or samples <br />B Contractor shall submit resume and_valid professional license of Geologist after <br />securing the contract and before drilling. All minimum qualifications of the Geologist <br />shall be identified in the resume. If qualifications of the selected Geologist are not met <br />or invalid, then the Contractor shall provide another Geologist. <br />C Submit completed well logs to the Engineer after the installation. The well logs shall <br />include a letter of certification by the Geologist. The deliverables to be in PDF format. <br />Well logs shall identify: <br />1 The lithology information and details of the boring. Each lithology shall have a <br />separate shading and legend:. - <br />2 As -built details of the well construction including elevation of existing grade and top of <br />monitoring probes. All details shall be labeled and or have a legend. <br />D Copy of approved drilling permits from EHD before drilling. <br />1.02 QUALITY ASSURANCE <br />A Contractor shall maintain pipe probe identification throughout the well installation. <br />Contractor shall not get the probe pipe mixed up. <br />B Contractor shall label each probe pipe with color coordination with respect to probe <br />pipe depth as shown in the drawings. <br />FH-LFG System Upgrade Phase 1 Section 01730 Page 19 <br />Technical Specifications Soil Gas Well <br />