Laserfiche WebLink
D <br />, <br />5.02 <br />SURFACE COMPLETION <br />A <br />Measurement <br />Measurement for payment for soil gas surface completion shall be per the number <br />B <br />Payment <br />Payment for surface completion shall be per lump sum cost quoted in the bid <br />proposal. The lump sum cost shall include full compensation for: <br />1 <br />Fabricating the well enclosure per the plans and specifications. <br />2 <br />Painting the well enclosure <br />3 <br />Installing the well enclosure with the concrete well skirt. <br />4 <br />Inscribing the date and well No. on the concrete well skirt. <br />5 <br />Labeling the well enclosure <br />6 <br />Installing the Polyethylene tube and cock valve on probe pipe <br />7 <br />Securing the pipe probe on the steel channel <br />8 <br />Painting probe pipe cock valves with the color code <br />9 <br />Placing Class 11 A.B. around well skirt. <br />10 Doing all the work involved in installing the well enclosure completely as shown on the <br />plans and specified herein. <br />5.03 ABANDONED BORINGS -SOIL <br />A Measurement <br />Measurement for payment for abandoned borings in soil shall be per linear foot <br />quoted in the proposal <br />B Payment <br />FH-LFG System Upgrade Phase 1 Section 01730 Page 28 <br />Technical Specifications Soil Gas Well <br />