My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2016-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2016-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:07:34 AM
Creation date
1/7/2022 10:13:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2016-2017
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F Paint probe pipe cock valves per the color code pipe prior to installation as shown on <br />the plan. Paint shall be nonvolatile paint. <br />4.05 WELL ENCLOSURE INSTALLATION <br />A Brace enclosure plumb during concrete placement, until set. <br />B Inscribe the concrete base with the designation of the well as shown on the plans. <br />Inscription shall be neat and professional in appearance. <br />C Once the concrete base of the enclosure has hardened, pour neat cement inside the <br />protective enclosure to the finish grade level of the concrete base in the presence of <br />the Engineer. When pouring cement slurry inside the enclosure, protect probes from <br />contact with neat cement. <br />D Apply etching primer first and then final coat of paint in the field. <br />E Well enclosure shall be labeled with the designated well number as shown on the <br />drawings using yellow paint. Labeling shall be by oil-based paint with brush, in a neat <br />and professional manner with lettering a minimum of four (4) inches in height using <br />stencils. <br />5.01 SOIL GAS WELL <br />A Measurement for installing soil gas wells shall be by the linear foot. Contractor shall <br />measure the depth from ground surface to the bottom of each well boring with a <br />weighted tape in the presence of the Engineer. <br />B Payment for soil gas wells shall be by the unit price per linear foot quoted in the <br />proposal. The unit price shall include full compensation for securing the EMD permits, <br />EHD inspection fees, drilling, Geologist oversite, providing well logs, leveling spoils in <br />the work area, and all work involved in installing the soil gas monitoring well as shown <br />on the plans and specified herein. <br />FH-LFG System Upgrade Phase 1 Section 01730 Page 27 <br />Technical Specifications Soil Gas Well <br />
The URL can be used to link to this page
Your browser does not support the video tag.