Laserfiche WebLink
Table 2 -LF -2 <br />Annual Postclosure Maintenance Cost Estimate <br />Foothill Sanitary Landfill <br />San Joaquin County, California <br />Revised 3/15/2017 <br />Items <br />Quantity <br />Units <br />Unit Cost <br />Subtotals <br />COVER MAINTENANCE <br />1 Soil (6" over landfill area) <br />17,908 <br />CY <br />$6.92 <br />$123,923 <br />2 Hydroseed <br />22 <br />AC <br />$3,860 <br />$84,920 <br />3 Mowing <br />666 <br />AC <br />$200 <br />$133,200 <br />Cover Repair Subtotal <br />$342,043 <br />LEACHATE COLLECTION <br />4 Operation, Maintenance, Disposal <br />10 <br />EACH <br />$11,360 <br />$113,603 <br />5 Leachate Sampling <br />10 <br />EACH <br />$504 <br />$5,040 <br />6 Leachate Analysis <br />10 <br />EACH <br />$700 <br />$7,000 <br />Leachate Collection Systems Subtotal <br />$125,643 <br />LFG (MIGRATION) MONITORING <br />7 Soil Gas Sampling <br />1 <br />LS <br />$4,907 <br />$4,907 <br />8 Soil Gas Analysis <br />1 <br />LS <br />$6,169 <br />$6,169 <br />9 Surface Emission Monitoring <br />1 <br />LS <br />$53,359 <br />$53,359 <br />Perimeter Monitoring Subtotal <br />$64,435 <br />LFG CONTROL SYSTEM <br />10 Maintenance and Operation <br />1 <br />LS <br />$1,235,591 <br />$1,235,591 <br />$1,235,591 <br />LFG System Subtotal <br />GROUNDWATER AND SURFACE WATER MONITORING <br />11 Groundwater and Surface Water Sampling <br />21 <br />EACH <br />$5,089 <br />$106,861 <br />12 Analysis (Included in No. 11 above) <br />13 Monitoring Well Maintenance <br />21 <br />EACH <br />$763 <br />$16,023 <br />$122,884 <br />Groundwater and Surface Water Monitoring Subtotal <br />VADOSE ZONE MONITORING <br />14 Vadose zone sampling <br />20 <br />EACH <br />$111 <br />$2,221 <br />15 Analysis <br />18 <br />EACH <br />$200 <br />$3,600 <br />$5,821 <br />Vadose Zone Monitoring Subtotal <br />DRAINAGE <br />16: See Note <br />1 <br />LS <br />$9,057 <br />$9,057 <br />Drainage Subtotal <br />$9,057 <br />SECURITY <br />17: See Note <br />1 <br />LS <br />$2,882 <br />$2,882 <br />Security Subtotal <br />$2,882 <br />SETTLEMENT ANALYSIS <br />18: Note <br />1 <br />LS <br />$14,822 <br />$14,822 <br />Settlement Analysis Subtotal <br />$14,822 <br />DECOMMISSIONING <br />19: See Note <br />1 <br />LS <br />$0 <br />$0 <br />Decommissioning Subtotal <br />$0 <br />OTHER <br />20: Inspections and Record Keeping <br />88 <br />Hrs <br />$160 <br />$14,115 <br />Other Subtotal <br />$14,115 <br />TOTAL ESTIMATED ANNUAL COST <br />$1,937,293 <br />TOTAL COST OVER 30 YEARS $58,118,786 <br />AC= acre <br />CY = cubic yard LF -2 Footprint = 594 acres <br />LS = lump sum Maintenance Cover thickness = 0.5 feet <br />Foothill Sanitary Landfill San Joaquin County DPW - Solid Waste <br />\\PWVMPF01\sharesWaint-0ps\OSolidWaste\Engineering\1Foothill\CalRecyde\2017 JTD Revision\2017 March WDR Revs\2017315 PCPCMP Revised 3/15/2017 <br />