Laserfiche WebLink
Table 2 -LF -2 <br />Annual Postclosure Maintenance Cost Estimate <br />Foothill Sanitary Landfill <br />San Joaquin County, California <br />Revised 3/15/2017 <br />COVER MANITENANCE <br />1. Average bid for "earthfill" in 2015 Area 2A, times 2 to take into account additional haul cost associated with cutting, loading and hauling soil <br />needed to fill 6" of fill. Number takes into account the fact that the process will only be done once over the 30 year period. Thus the total cost of <br />soil placement is divided by 30 years to take into account how much it is going to cost annually. Apportioned based on closure area of LF -2 vs. <br />the combined landfill closure area. <br />2. Average bid for "hydroseed" unit price in 2015 for Area 2A. Number takes into account the hydroseeding of the entire surface in 30 -year <br />postclosure. This number also takes into account that on LF -1 only 8 acres will need to be hydroseeded because the remainder is reflected in the <br />LF -2 costs. <br />3. Based on 2015 County contract w/ Barajas Landscaping Inc.This number takes into account the fact that only part of LF -1 that will need to be <br />mowed would be the top 8 acres. The remainder is reflected in the LF -2 costs. Apportioned based on closure area of LF -2 vs. the combined <br />landfill closure area. <br />LEACHATE COLLECTION <br />4. Based on contract current in 2016 (SCS). <br />5. Based on contract current in 2016 (SCS). <br />6. Based on contract current in 2016 (BC Labs). <br />LFG (MIGRATION) MONITORING <br />7. Based on contract current in 2016 (SCS)., apportioned based on footprint area LF -2 vs. the combined landfill footprint. <br />8. Based on contract current in 2016 (SCS)., apportioned based on footprint area LF -2 vs. the combined landfill footprint. <br />9. Based on contract current in 2016 (SCS). This number takes into account the fact that only part of LF -1 that will need to be monitored would be <br />the top 8 acres. The remainder of the footprint of LF -1 will be monitored automatically when they monitor all of LF -2. Thus The remainder is <br />reflected in the LF -2 costs. Apportioned based on closure area of LF -2 vs. the combined landfill closure area. <br />LFG CONTROL SYSTEM <br />10. Maintenance assumes all items replaced in 30 -year period. Costs based on contracts current in 2015, prorated per acreage of final landfill. <br />Apportioned based on closure area of LF -2 vs. the combined landfill closure area. <br />GROUNDWATER AND SURFACE WATER MONITORING - <br />Assume one technician samples 2 days per event. Assume quarterly sampling for groundwater and bi-annual for surface water., apportioned <br />based on footprint area LF -2 vs. the combined landfill footprint. <br />11. Based on contract current in 2016 (CB&I)., apportioned based on footprint area LF -2 vs. the combined landfill footprint. <br />12. CB&I's proposal for groundwater monitoring includes analysis costs. <br />13. Replacing all wells in 30 -year period, using contract current in 2016. <br />VADOSE ZONE SAMPLING <br />14. Assumes two vadose sampling points per Module. Costs based on contracts current in 2015 (SCS) ., apportioned based on footprint area LF - <br />2 vs. the combined landfill footprint. <br />15. TO -15 Analysis per contract current in 2015 (SCS). <br />DRAINAGE <br />16. Replaces all features in 30 -year period, uses costs current in 2015. Apportioned based on closure area of LF -2 vs. the combined landfill <br />closure area. <br />SECURITY <br />17. Using costs current in 2015 (C&R Fence), replaces all fence in 30 -year postclosure period. Apportioned based on closure area of LF -2 vs. the <br />combined landfill closure area. <br />SETTLEMENT ANALYSIS <br />18. From Andreg proposal for survey and analysis, current in 2015. Apportioned based on closure area of LF -2 vs. the combined landfill closure <br />area. <br />DECOMMISSIONING <br />19. All environmental monitoring facilities to remain in place: no cost. Apportioned based on closure area of LF -2 vs. the combined landfill closure <br />area. <br />OTHER <br />20. Based on consultant costs (GeoSyntec) for design of Area 2A at Foothill Landfill 2015., apportioned based on footprint area LF -2 vs. the <br />combined landfill footprint. <br />Foothill Sanitary Landfill San Joaquin County DPW - Solid Waste <br />\\PWVMPF014shares\Maint-Ops\OSolidWaste\Engineering\1 FoothiilhCalRecycle\2017 JTD Revision\2017 March WDR Revs\2017315 PCPCMP Revised 3/15/2017 <br />