My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2014-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2014-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:06:07 AM
Creation date
1/7/2022 4:19:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2014-2015
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />C <br />r <br />rl <br />L' i <br />C <br />I <br />1.5 CONSTRUCTION SCHEDULE <br />SWD will schedule installation of the GW monitoring well after approval of <br />drilling permit from San Joaquin County Environmental Health Department <br />(EHD). Drilling and installation of GW well will take minimum of 4 working <br />days. The work hours will be Monday to Friday from 7:00 am to 4.30 pm. <br />1.6 UTILITIES CLEARANCE <br />Prior to drilling, Underground Service Alert (USA) will be notified. Drilling <br />location near overhead power lines will be checked for drill rig clearances <br />before drilling: Well location will be adjusted as needed. <br />2.0 WELL DRILLING <br />The well will be drilled and developed by Gregg Drilling, a licensed C-57 <br />Contractor. A hollow stem auger drill rig is anticipated to be used to drill the <br />wells. If the drillings becomes difficult, then a different type of drill rig will be <br />brought in. <br />SWD's consultant soils Engineer or Geologist will observe the drilling and <br />develop a boring log. Spoils will be dispersed around the drilled boring. <br />2.1 UNCOMPLETED BORINGS <br />If the boring is not drilled to depth by the end of a working day, the hollow stem <br />auger will be left in the uncompleted boring. The opening of the auger will be <br />covered to prevent materials falling inside the auger. The drilling area will be <br />cordoned with safety cones. <br />2.2 ABANDONED BORING <br />Borings that are difficult to drill or do not encounter groundwater will be <br />abandoned as determined in the field by SWD. A new boring will be drilled. <br />Abandoned borings will be grouted with neat cement. <br />►' �► ►Ill �' X11ll ' OIL <br />It is anticipated that the groundwater wells will be constructed immediately after <br />drilling. Well construction will be according to the well details (Figure 2) and to <br />the technical specifications (Appendix A). SWD's consulting Soil's Engineer or <br />Geologist will log the well installation and provide well logs. <br />FH-NIW-6 GW Well Installation San Joaquin County <br />September 17, 2014 Department Of Public Works <br />2 Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.