Laserfiche WebLink
1 <br />C <br />11 1 <br />H <br />n <br />C1 <br />1 <br />3.1 INSPECTIONS <br />Well installation will be in the presence of EHD inspector. SWD will notify <br />EHD Unit 6 inspector(s) at least five (5) working days in advance about <br />the project schedule and the date and time for the first inspection. <br />Consecutive inspections needed for the project will be scheduled with <br />EHD inspector on site after the first inspection. <br />Inspections will be coordinated with EHD for the following work: <br />1. Well Installation <br />2. Backfill of abandoned borings <br />SWD understands that drillingthe well borehole does not require <br />q <br />inspection by EHD. . <br />SWD will schedule Inspections with EHD, between 9:00 a.m. and 4:00 p.m <br />during working days. SWD will pay overtime for inspections that require <br />overtime hours by EHD staff. <br />FH -MW -6 GW Well Installation San Joaquin County <br />September 17, 2014 Department Of Public Works <br />3 Solid Waste Division <br />