My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2014-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2014-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:06:07 AM
Creation date
1/7/2022 4:19:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2014-2015
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. Contractor shall periodically gently surge the water inside the well casing <br />and screen to compress the sand pack while placing the sand. Contractor <br />shall measure the top of the sand pack periodically <br />11. Contractor shall add sand shall until the sand pack is above the top of the <br />screened interval as shown on the groundwater well figure. <br />12. Once the placement of the sand packed interval is completed, the <br />contractor shall measure and record the depth to the top of the pack in the <br />presence of the Engineer. <br />San Joaquin County <br />Groundwater Monitoring Well Specifications 7 Public Works Dept <br />Solid Waste Division <br />D. The well screens, bentonite seals and neat cement seals shall be installed in <br />accordance with the following sequence: <br />1. Contractor shall estimate the length of casings needed and verify with the <br />Engineer before lowering into the boring. Well casing shall be at least 5 <br />feet above grade. <br />2. Contractor shall not use couplings, or glue to join well casings. <br />3. Contractor shall install a PVC slip end cap or a well plug on the top of both <br />well casings before placing the casing in the bore hole. <br />4. Contractor shall connect and lower the well casing assembly gently. <br />5. If the well casing assembly is dropped, lowered abruptly, or for any other <br />reason suspected of being damaged during placement, the well casing <br />assembly shall be removed from the borehole for inspection by the <br />Engineer. The need to inspect the casing will be at the sole judgment of <br />the Engineer. <br />6. If the well casing rises after being placed in the borehole, the Contractor <br />shall not place any drilling equipment such as drill pipe, hammers, etc. on <br />the casing to prevent the casing from rising. Contractor shall notify the <br />Engineer immediately of rising casing, and shall measure the amount of <br />rise. <br />7. Contractor shall place the sand pack into the annular space around the <br />screened interval. Clean water and a tremie pipe may be used to assist <br />with sand pack placement. If the well assembly is installed through the <br />hollow stem augers, the augers shall be pulled slowly during sand pack <br />installation. <br />8. Contractor shall minimize bridging of the sand by pouring the sand in the <br />bore hole gently and not in large quantity. Patience shall be exercised by <br />the Contractor. <br />9. Contractor shall monitor the sand pack settlement by measuring the sand <br />level with a weighted tape. Contractor shall also monitor the top of the well <br />casing to detect any movement due to settlement or from drive casing <br />removal. <br />10. Contractor shall periodically gently surge the water inside the well casing <br />and screen to compress the sand pack while placing the sand. Contractor <br />shall measure the top of the sand pack periodically <br />11. Contractor shall add sand shall until the sand pack is above the top of the <br />screened interval as shown on the groundwater well figure. <br />12. Once the placement of the sand packed interval is completed, the <br />contractor shall measure and record the depth to the top of the pack in the <br />presence of the Engineer. <br />San Joaquin County <br />Groundwater Monitoring Well Specifications 7 Public Works Dept <br />Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.