Laserfiche WebLink
Ci <br />I <br />C' <br />0 <br />u <br />CI <br />13. Contractor shall install a bentonite seal in the annular space above the <br />sand pack. Add bentonite gradually to avoid bridging. Contractor shall <br />measure the depth of the bentonite plug using a weighted tape. <br />14. Contractor shall hydrate the bentonite seal after placement with five (5) <br />gallons of distilled or Engineer -approved water for each 2.5 vertical feet of <br />seal. <br />15. Contractor shall add sufficient water to hydrate the bentonite. Contractor <br />shall add water to the bentonite seal and allow the bentonite to hydrate for <br />minimum of 30 minutes. Contractor shall measure the water elevation over <br />the bentonite after adding water and again 30 minutes later. If water <br />elevation has dropped during that time, then Contractor shall wait for <br />another 30 minutes before grouting with neat cement. <br />16. Contractor shall pump neat cement through a tremie pipe filling the annular <br />space from the top of the bentonite seal upward. The bottom of the tremie <br />pipe shall be maintained below the top of the cement to prevent free fall <br />and bridging. <br />17. Contractor shall place neat cement in a single pour for wells up to 100 feet <br />deep. For wells deeper than 100 feet, the Contractor shall pour neat <br />cement in two pours, the second pour being at least 24 hours after the first <br />pour. <br />18. When drilling with hollow stem augers, the hollow stem of the auger may <br />be substituted for the tremie pipe, provided the bottom of the augers are no <br />more than 10 feet above the top of the neat cement layer within the well. <br />19. Contractor shall place neat cement in the boring up to the existing grade. <br />Contractor shall allow neat cement to settle overnight. After neat cement <br />settlement, Contractor shall place additional neat cement to a level as <br />indicated in the construction figures. <br />20. Contractor shall install the well enclosure and do the surface completion <br />only after the neat cement has hardened. <br />E. Contractor shall record the following information on the Driller's Log: <br />1. Depth to water -bearing zones <br />2. Total depth of bore hole <br />3. Depth from ground surface to top and bottom of the well screen interval <br />4. Depth from ground surface to top of the sand pack interval <br />5. Depth from ground surface to top of the bentonite plug <br />6. Height above the ground surface of the top of the well casing <br />7. Height above the ground surface of the top of the steel protective casing <br />San Joaquin County <br />Groundwater Monitoring Well Specifications 8 Public Works Dept <br />Solid Waste Division <br />