My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DUCK CREEK
>
3633
>
2300 - Underground Storage Tank Program
>
PR0232461
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2022 4:53:35 PM
Creation date
1/10/2022 9:26:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0232461
PE
2361
FACILITY_ID
FA0003758
FACILITY_NAME
RYDER TRUCK RENTAL #1071
STREET_NUMBER
3633
STREET_NAME
DUCK CREEK
STREET_TYPE
DR
City
STOCKTON
Zip
95215
APN
17331001
CURRENT_STATUS
01
SITE_LOCATION
3633 DUCK CREEK DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6 . TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by © Manufacturer ❑x Industry Standard © Professional Engineer <br /> Test Type [rl Pressure x❑ Vacuum ® Hydrostatic <br /> Test Equipment Used : Vacuum gauge <br /> Tank ID Main Diesel Reserve Diesel New Oil Waste Oil <br /> Tank Manufacturer Fiberglass Fiberglass Fiberglass Fiberglass <br /> Tank Capacity 12 , 000 6000 5000 2000 <br /> Test Start Time 9 : 00 am 9 : 00 am 10 : 30 am 10 :45 am <br /> Initial Reading 10Itvac 10 to <br /> vac 1011 vac 1091 vac <br /> Test End Time 10 : 00 am 10 : 00 am 11 : 30 am 11 : 45 am <br /> Final Reading 1011 vac 1011 vac 1011 vac 1011 vac <br /> Change in Reading 0 0 0 0 <br /> Pass/ Fail Criteria Pass Pass Pass Pass <br /> Tightness Test Results ❑x Pass © Fail ❑x Pass © Fail ❑x Pass [❑ Fail ❑x Pass [1 Fail <br /> 7 . PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by Manufacturer ❑x Industry Standard Professional Engineer <br /> Test Type ❑x Pressure Vacuum © Hydrostatic <br /> Test Equipment Used : Pressure gauge <br /> Pipe Run ID Main Diesel Prod . Main Diesel Vent Reserve Diesel Prod Reserve Diesel Vent <br /> Pipe Manufacturer AOS AOS AOS AOS <br /> Test Start Time 8 : 00 am 8 : 00 am 9 : 15 am 9 : 15 am <br /> Initial Reading 5 psi 5 psi 5 psi 5 psi <br /> Test End Time 9 : 00 am 9 : 00 am 10 : 15 am 10 : 15 <br /> Final Reading 5 psi 5 psi 5 psi 5 psi <br /> Change in Reading 0 0 0 0 <br /> Pass/ Fail Criteria Pass Pass Pass Pass <br /> Tightness Test Results 0 Pass © Fail ® Pass ® Fail © Pass M Fail ❑ Pass rl Fail <br /> Pipe Run ID New Oil Supply/Air New Oil Vent W/O Remote Fill W/O Vent <br /> Pipe Manufacturer AOS AOS AOS AOS <br /> Test Start Time 11 : 15 am 11 : 15 am <br /> Initial Reading 5 psi 5 psi <br /> Test End Time 12 : 15 pm 12 : 15 pm <br /> Final Reading 5 psi 5 psi <br /> Change in Reading 0 0 <br /> Pass/ Fail Criteria Pass Pass <br /> Tightness Test Results M Pass ❑x Fail M Pass ❑x Fail ❑x Pass ® Fail ❑x Pass r] Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail' and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section . <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.