My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DUCK CREEK
>
3633
>
2300 - Underground Storage Tank Program
>
PR0232461
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2022 4:53:35 PM
Creation date
1/10/2022 9:26:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0232461
PE
2361
FACILITY_ID
FA0003758
FACILITY_NAME
RYDER TRUCK RENTAL #1071
STREET_NUMBER
3633
STREET_NAME
DUCK CREEK
STREET_TYPE
DR
City
STOCKTON
Zip
95215
APN
17331001
CURRENT_STATUS
01
SITE_LOCATION
3633 DUCK CREEK DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8 . SUMP/ UDC TEST (continued ) <br /> Test Method Developed by © Manufacturer Industry Standard Professional Engineer <br /> Test Type © Pressure © Vacuum ❑x Hydrostatic <br /> Test Equipment Used : Caldwell Sump Tester <br /> Sump/UDC ID Transition Sump Master UDC 1 /2 Satellite UDC 1 Satellite UDC 2 <br /> Sump Manufacturer Fiberglass Fiberglass Fiberglass Fiberglass <br /> Sump Depth ( inches ) 36" 32 " 32 " 3211 <br /> Sump Bottom to Top of 11 7 10" 10 it <br /> Highest Pipe Penetration <br /> ( inches ) <br /> Test Start Time 8 : 00 am 8 : 00 am 8 : 45 am <br /> Initial Reading 1st Line 1st Line 1st Line <br /> Test End Time 8 : 30 am 8 : 30 am 9 : 15 am <br /> Final Reading 1st Line 1st Line 1st Line <br /> Change in Reading 0 0 0 <br /> Pass / Fail Criteria Pass Pass Pass <br /> Tightness Test Results ❑ Pass ❑x Fail ❑x Pass rl Fail ❑x Pass ® Fail ❑x Pass © Fail <br /> Sump/UDC ID Master UDC 3/4 Satellite 4 <br /> Sump Manufacturer Fiberglass Fiberglass <br /> Sump Depth ( inches ) 32 ° 32° <br /> Sump Bottom to Top of 751 7 " <br /> Highest Pipe Penetration <br /> ( inches ) <br /> Test Start Time 9 : 30 am 9 : 30 am <br /> Initial Reading 1st Line 1st Line <br /> Test End Time 10 : 00 am 10 : 00 am <br /> Final Reading 1st Line 1st Line <br /> Change in Reading 0 0 <br /> Pass/ Fail Criteria Pass Pass <br /> Tightness Test Results x❑ Pass © Fail ❑x Pass rl Fail O Pass E] Fail © Pass [rl Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail" and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section . <br /> Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.