Laserfiche WebLink
Pacific Gas and Plep RBv1eW Teel PGEPIenRevlew�ppe.com <br />S <br />E/ectric Company �e�a Ma�agama�l <br />January 72, 2022 <br />John B Anderson <br />County of San Joaquin <br />'1870 E Hazelton Avenue <br />Stockton, CA 95205 <br />Ref: Gas and Electric Transmission and Distribution <br />Dear John B Anderson, <br />Thank you for submitting the PA -2700287 plans for our review. PGBE will review the submitted <br />plans in relationship to any existing Gas and Electric facilities within the project area. If the <br />proposed project is adjacant/or within PG&E own¢d prop¢rty and/or easements, we will be <br />working with you to ensure compatible uses and activities near our facilities. <br />Attached you will find information and requirements as it relates to Gas facilities (Attachment 7) <br />and Electric facilities (Attachment 2). Plaasa review thas¢ in detail, as it is critical to ensure <br />your safety and to protect PGB.E's facilities and its existing rights. <br />Below is additional information for your review: <br />7. This plan review process does not raplac¢ the application process for PG8.E gas or <br />¢lectric service your project may require. For these requests, please continue to work <br />with PGBE Service Planning: httos://www.oce.com/en US/business/services/building <br />2. If the project bain9 submitted is part of a larger project, please include the entire scope <br />of your project, and not just a portion of it. PG&E's facilities ora to b¢ incorporated within <br />any CEQA docum¢nt. PG&E needs to verify that the CEQA document will Identify any <br />required future PG8E services. <br />3. An engineering deposit may be required to review plans for a project depending on the <br />size, scope, and location of the project and as it relates to any r¢arrangement or new <br />installation of PGBE facilities. <br />Any proposed uses within the PG&E fee strip and/or easement, may Include a California Public <br />Utility Commission (CPUC) Section 857 filing. This requires the CPUC to render approval for a <br />conveyance of rights for specific uses on PG&E's fee strip or easement. PGBE will advise if the <br />necessity to incorporate a CPUC Section 857filing is required. <br />This latter does not constitute PG8.E's consent to use any portion of its easement for any <br />purpose not previously conveyed. PGBE will provide a project specific response as required. <br />Sincerely, <br />Plan Review Team <br />Land Management <br />PGB,.G Gas and Electric Facilities Page 1 <br />