My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014651
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARNAUDO
>
0
>
2600 - Land Use Program
>
PA-2100287
>
SU0014651
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 2:31:26 PM
Creation date
1/12/2022 1:49:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014651
PE
2632
FACILITY_NAME
PA-2100287
STREET_NUMBER
0
Direction
E
STREET_NAME
ARNAUDO
City
MOUNTAIN HOUSE
Zip
95391-
APN
25402002
ENTERED_DATE
12/16/2021 12:00:00 AM
SITE_LOCATION
E ARNAUDO
RECEIVED_DATE
1/11/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br />& E/ec7iic Company" <br />Attachment 7 — Gaa Facll sties <br />There could ba gas transmission pipelines in this area which would b¢ considered critical <br />facilities for PG8.E and a high priority subsurtaca installation under California law. Care must be <br />taken to ensure safety and accessibility. So, please ensure that if PG8.E approves work near <br />gas transmission pipelines it is done in adherence with the below stipulations. Additionally, th¢ <br />following link provides additional information regarding legal requirements under California <br />excavation laws: httos://www.usanorth87 t.ora/images/odfs/CA-LAW-2078.odf <br />7. Standby Inspection: A PG&E Gas Transmission Standby Inspector must ba present <br />during any demolition or construction activity that comes within 1 O feet of the gas pipeline. This <br />includes all grading, trenching, substructure depth verifications (potholes), asphalt or concret¢ <br />demolition/removal, removal of trees, signs, light poles, etc. This inspection can be coordinated <br />through the Underground Service Alert (USA) service at 811. A minimum notice of 48 hours is <br />required. Ensure the VSA markings and notifications are maintained throughout the duration of <br />your work. <br />2. Access: At any time, PGS,E may need to access, excavate, and pertorm work on the gas <br />pipeline. Any construction ¢quipmant, materials, or spoils may Head to be removed upon notice. <br />Any temporary construction fencing installed within PGB.E's easement would also need to ba <br />capable of being removed at any lima upon notice. Any plans to cut temporary slopes <br />exceeding a 1:4 grade within 1 O feet of a gas transmission pipeline need to be approved by <br />PGRE Pipeline Services in writing PRIOR to pertorming the work. <br />3. Wheel Loads: To prevent damage to the buried gas pipeline, there are weight limits that <br />must be enforced whenever any equipment gats within 10 feet of traversing the pipe. <br />Ensure a list of the axle weights of all equipment being used is available for PG&E's Standby <br />Inspector. Te confirm the depth of cover, the pipeline may need to be potholed by hand in a few <br />areas. <br />Due to the complex variability of tracked equipment, vibratory compaction equipment, and <br />cranes, PGB,E must evaluate those items on a case-by-case basis prior to us¢ over the gas <br />pipeline (provide a list of any proposed equipment of this type noting model numbers and <br />specific attachments). <br />No equipment may be set up over the gas pipeline while operating. Ensure crane outriggers ora <br />at least 70 feat from the centerline of the gas pipeline. Transport trucks must not be parked over <br />the gas pipeline while being loaded or unloaded. <br />4. Grading: PGS,E requires a minimum of 36 Inches of cover over gas pipelines (or existing <br />grad¢ if lass) and a maximum of 7 feet of cover at all locations. The graded surtace cannot <br />exceed a cross slope of 1:4. <br />5. Excavating: Any digging within 2 feat of a gas pipeline must ba dug by hand. Note that <br />while the minimum clearance is only 72 inches, any excavation work within 24 inches of the <br />edge of a pipeline must ba done with hand tools. So to avoid having to dig a trench entirely with <br />hand tools, the edge of the trench must be over 24 inches away. (Doing the math fora 24 inch <br />PGScE Gas and Electric Facilities Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.