My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2022 8:32:19 AM
Creation date
1/12/2022 4:13:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95366
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71 SO-TOOL PROCEDURE BELOW, STEP I OA: TIGHTEN THE 71 SO-TOOL <br /> FOR 71 SO-TOOLC,SEE PAGE 9 Use the three view holes to ensure that the tool seats <br /> FOR 71 SO-TOOLCT,SEE PAGE 10 out flat against the top of the inlet tube, To prevent <br /> vertical movement of the tool during drilling,hand <br /> Note: 71 SO-TOOL can only be used with testable tighten all three knobs even ly to the upper drop tube. <br /> overfill valves if modified as shown below. A 2" See Figure 10A. <br /> wide slot must be added to accommodate cast lug. <br /> STEP 9 9 A: PREPARE DRILL AND BIT <br /> Add 2"wide Confirm that the stop on the 3116"drill bit supplied <br /> slot to use with with the 71 SO-TOOL is in the correct position before <br /> testable valves drifling. The stop is factory installed at a distance be- <br /> tween 2"to 2-1/16"from the tip with the 71 50-TOOL. If <br /> the stop is not at the correct position it must be fixed <br /> - before drilling. <br /> ----------- <br /> CAUTION. If the drill stop is not in the proper loca- <br /> tion failure of a pressure decay leak test may result. <br /> € e2} <br /> 71 SO-TOOL Modifications for Testable Inlet <br /> STEP 9A: INSERT 7153-TOOL OVER INLET TUBE <br /> To install the 7150-TOOL(sold separately)over the inlet <br /> tube,first loosen all three knobs,so the tool can pass Tip to stop dimension must be <br /> freely over the inlet tube flange. Align the slot on the 2"to 2-1/16". <br /> tool with the key on the inlet tube and insert the tool <br /> down. See Figure 9A. Figure i 1A <br /> Loosen all Hand STEP 12A: DRILL HOLES <br /> Tool spot knobs view holes tighten With the inlet tube and 71 SO FOOL in place,carefully <br /> rr _; knobs drill a 3116"diameter hole in the upper tube using the <br /> eaenly drill bushing in the knob as a guide. The drill stop is pa- <br /> �.__� " sitioned so it will bottom out against the knob after the <br /> 4 ---"' - bit has drilled through the upper drop tube. If the stop <br /> is positioned wrong either no hole will be drilled,or a <br /> I'llthrough hale could potentially be drilled through the <br /> inlet tube. If no hole is drilled return to step 11A and <br /> check the stop dimension. If a hole is drilled through <br /> ® the inlet tube or into the screw hole the assembly is not <br /> Inlet salvageable. drill (2)more holes in the two remaining <br /> Tube knobs. <br /> I key <br /> i <br /> Drill thru upper <br /> Figure 9A Figure ?OA tube only <br /> Figure 12A <br /> s <br />
The URL can be used to link to this page
Your browser does not support the video tag.