My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2022 8:32:19 AM
Creation date
1/12/2022 4:13:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95366
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71 SO-TOOLC PROCEDURE BELOW, STEP 118: PREPARE DRILL AND BIT <br /> FOR 71SO-TOOL,SEEPAGES Confirm that the stop on the 3116"drill bit supplied <br /> FOR 71 SO•TOOLCT,SEE PAGE 10 with the 7150-TOOLC is in the correct position before <br /> drilling. The stop is factory installed at a distance be- <br /> Notet 71 SO-TOQLC can only be used with testable tween 1-3116"to 1-114"from the tip with the 71 SO- <br /> overfill valves of modified as shown bellow. T001-C. If the stop is not at the correct position it must <br /> be fixed before drilling, <br /> . CAUTION: If the drill stop is not in the proper Iota <br /> - <br /> -------------- tion failure of a pressure decay leak test may result. <br /> it 71 SO-7"OaIC <br /> . ..... 'I <br /> ......._ <br /> i <br /> v <br /> i <br /> Add a 10-24 UNC thread or similar <br /> to all three legs of the 71 SO- Tip to stop dimension must <br /> TooLC in the area shown. Use se# be 1-3116"to 1-114" <br /> screws to secure tool to upperFigure 7 7B <br /> tube. <br /> STEP 12B: DRILL HOLES <br /> 7150-TOOLC Modifications for Testable Inlet With the inlet tube and 71 SO-TOOLC in place,carefully <br /> drill a 3116"diameter hole in the upper tube using the <br /> STEP 96: INSERT 71 SO-TOOL[OVER INLET TUBE hole in the 71 SO-TOOLC as a guide. The drill stop is po- <br /> To install the 71 SO-TOOLC(sold separately)over the sitioned so it will bottom out against the tool after the <br /> inlet tube,first loosen the thumb screw,so the tool can bit has drilled through the upper drop tube. If the stop <br /> pass freely over the inlet tulle flange. Align the slot on is positioned wrong either no hole will be dri Iled,or a <br /> the tool with the key on the inlet tube and insert the through hole could potentially be drilled through the <br /> tool down. See Figure 9B. inlet tube. If no hole is drilled return to step 11 B and <br /> Tool Slot Hand tighten thumb screw check the stop dimension, If a hole is drilled through <br /> the inlet tube or into the screw hole the assembly is not <br /> tb <br /> salvageable. Drill(2)more holes in the two remaining <br /> Q Q guide holes. <br /> Lo othu ���SCi'et <br /> be <br /> nri9 through upper tubearly <br /> STEP 1 OB: TIGHTEN THE 71 SO-TOOLC Figure 728 <br /> Ensure that the tool seats flat against the top of the inlet <br /> tune. To prevent vertical movement of the tool during <br /> drilling, hand tighten the thumb screw against the up- <br /> per drop tube. See Rgum 108. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.